5.3.1.1 Possible failure conditions and their causes, modes of failure, and damage from sources external to the system.
5.3.1.2 The possibility of multiple failures due to a common cause, multiple independent failures, and undetected failures.
5.3.1.3 The possibility of requirement, design, and implementation errors.
5.3.1.4 The effect of flightcrew errors reasonably expected in service after the occurrence of a failure or failure condition. (See AC 25.1302-1.)
5.3.1.5 The effect of reasonably anticipated errors when performing maintenance actions.
5.3.1.6 The flightcrew alerting cues, corrective action required, and the flightcrew capability of detecting faults.
5.3.1.7 The resulting effects on the airplane and its occupants, or other persons (such as ground crew or maintenance personnel), considering the stage of flight, the operational sequences (sequence of system responses or expected flightcrew actions following a failure(s)), and operating and environmental conditions.
5.3.2 Planning. This AC provides guidance on methods of accomplishing the safety objective. The detailed methodology needed to achieve this safety objective depends on many factors, particularly, the degree of system complexity and integration. For proposed airplane designs that will contain many complex or integrated systems, it is likely that the applicant will need to propose and develop a plan to describe the intended process. In general, the extent and structure of the analyses to show compliance with § 25.1309 will be greater when the system is more complex, and the effects of the failure conditions are more severe. Industry standards such as those listed in paragraph 1.4.5 of this AC provide further information on the planning activity. This plan should include consideration of all of the following aspects:
5.3.2.1 Functional and physical interrelationships of systems.
5.3.2.2 Determination of detailed means of compliance, which may include the use of development assurance techniques.
5.3.2.3 Means for establishing the accomplishment of the plan, including how the plan is followed throughout the project to ensure completion.
5.3.3 Availability of Industry Standards and Guidance Materials. There are a variety of acceptable techniques used currently in industry, some of which are reflected in SAE ARP 4754 and ARP 4761. This AC is not intended to constrain the applicant to the use of these documents in defining their particular methods for