Conventional aircraft. Rotorcraft. eVTOL. New ideas with real engineering questions.
We connect the certification basis, aircraft architecture and safety evidence. Explore the approach for your programme, with the relevant guidance close at hand.
New or novel features can arise within any aircraft category.
Your programme / eVTOL & AAM
eVTOL & advanced air mobility
Bring aircraft safety, propulsion, flight controls, energy and development assurance together early. Establish the certification route from the configuration and intended operation.
FAA / Powered-lift
The special-class route uses §21.17(b). AC 21.17-4 provides procedures and accepted criteria for eligible powered-lift. Its Appendix A criteria cover up to 12,500 lb, six passenger seats and battery-electric engines driving propellers; other designs can need alternate or additional criteria. Identify whether essential performance, increased performance, or both approvals are sought.
Use SC-VTOL Issue 2 and the applicable final Means of Compliance. Its small-category scope includes up to nine passenger seats and a maximum certified take-off mass of 5,700 kg; confirm the remaining applicability limits. Category Enhanced addresses continued safe flight and landing; Category Basic addresses a controlled emergency landing. Retain the selected issues and programme agreements.
Record the FAA performance approval and EASA category separately. Each framework sets its own objectives and applicability.
What the latest EASA MoC means for this work
MOC-5 Issue 2 updates VTOL.2510 guidance to reference ARP4754B and ARP4761A. Its common mode guidance includes IDAL A items; assurance allocation remains subject to its stated category conditions. Agree the development-assurance scope with EASA early.
It also addresses latent failures and certification credit from simulation benches and test rigs. Our evidence planning connects these topics to the design, test configuration and assumptions being substantiated.
Assess hover, transition and wing-borne flight, where applicable. Connect loss or erroneous output of lift, thrust or control functions to the aircraft response and achievable safe outcome.
Which resources can affect several functions together?
Examine shared energy, cooling, power conversion, data, sensing and computing. Trace propagation and dependencies between propulsion and flight control.
What supports the monitoring and reconfiguration credit?
Define detection coverage, isolation, response time and remaining capability. Include latent failures, common modes, dispatch states and degraded configurations.
Can the evidence support the aircraft-level conclusion?
Link supplier assessments to aircraft objectives. Identify representative rig configurations, model validity, fault coverage, flight evidence and the assumptions each result can close.
Read with the basis in view
Useful regulations and guidance.
Source texts and our explanations are kept separate.
Bring the aircraft concept, intended operation, proposed FAA/EASA route, flight-phase definitions, major shared resources and the current safety or assurance plan.
eVTOL / An illustrative safety question
Several lift units. One shared cooling circuit.
A fictional example of how an aircraft-level question becomes design requirements and evidence. It assigns no failure classification or assurance level.
Start with the available thrust and control.
A fictional eVTOL has several lift units connected to one cooling circuit. If that circuit is lost during transition, determine which units are affected, how quickly their capability changes and what the aircraft can still do. Examine the relevant flight phases, conditions and crew response.
Trace the shared dependency through the design.
Map the cooling circuit, affected equipment, temperature sensing, power limits and protective responses. Determine whether one fault can degrade several lift units together. Define any separation, thermal endurance, monitoring, reconfiguration and response-time requirements needed to support the safety objectives.
Show that the claimed response is achievable.
Define representative thermal and integration tests, fault-insertion cases and aircraft-response evidence. Establish what each model or rig represents, its limits and the design configuration tested. Reconcile the results with the assessed loss of capability and close the assumptions before taking credit in the final assessment.
Across the programme
Carry the safety argument through development.
Our approach draws on ARP4761A and ARP4754B. We agree the methods, editions and extent of application against the programme’s certification basis.
01 / Establish
Functions, effects and objectives
Define aircraft and system functions, operating conditions, failure effects, classifications and assumptions.
These activities iterate as the design develops. The supporting FTA, FMEA/FMES, common-cause and dependency work follows the questions raised by the architecture.
Source editions, applicability and the scope of our support
Source editions checked on 16 November 2026. The selected regulations, guidance and publication records support the distinctions shown here; the engineering questions and work-product outlines are Aerospace Consulting’s explanations.
Confirm the certification basis, amendment levels, accepted means and current source status for each programme. FAA and EASA terminology, categories and safety objectives need their own applicability assessment.
Consulting support is agreed to suit the programme. Any delegated approval must be within the specific authority granted for that work, including any additional authorisation required for a special-class project.
FAA AC 20-174 recognises ARP4754A. EASA CM-DASA-002 and the final SC-VTOL MoC provide their own scoped treatment of later development-assurance guidance. Use the applicable authority position when agreeing editions.
CM-DASA-002 addresses aircraft and system development assurance and its interfaces with safety assessment. The safety assessment process itself and item-specific software and hardware assurance are outside its scope.
Conventional Aircraft
Safety and certification support for fixed wing aircraft and the systems that make them work.
Aircraft and system safety assessments
Flight controls, avionics and equipment
Certification planning and compliance evidence
FAA DER services within the applicable delegation
Proposed sector introduction for review.
Rotorcraft
Connect rotorcraft safety, system architecture and certification evidence.
Flight control and autoflight systems
Hazard assessments and architecture reviews
Avionics and systems integration
Certification and verification planning
Proposed sector introduction for review.
eVTOL & advanced air mobility
Bring safety and certification thinking into emerging aircraft programmes from the outset.
Aircraft and system safety assessments
Flight controls and actuation architecture
Development assurance and verification evidence
Certification planning and technical coordination
Proposed sector introduction for review.
Certification & DER support
Tell us about the aircraft or system, the approval sought, its stage of development and the question you need to resolve.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.