HomeExpertiseSystems Engineering

Development assurance / ARP4754B

Systems
engineering.

From intended function to verified implementation.

We help aircraft developers and systems suppliers connect requirements, architecture, safety and verification throughout development, with particular depth in flight controls, autoflight and integrated aircraft systems.

Explore our approach

Aircraft, system and supplier perspectives

Our approach

Development assurance built into the engineering.

Our approach is based on ARP4754B, integrated with the ARP4761A safety assessment process. We tailor the activities, evidence and review independence to the applicable assurance levels and the programme’s agreed certification approach.

Requirements, architecture and safety assessments develop together. Findings return to the relevant teams as the design and its evidence mature.

Requirements validation
Establish that the requirements are correct and complete for the intended application, including their assumptions, interfaces and operational context.
Implementation verification
Establish that the implemented system meets its requirements, with evidence tied to the assessed configuration and the conditions of verification.
Assurance throughout development
Keep plans, requirements, design decisions and evidence under control. Review whether the agreed processes are being followed and address gaps as they arise.

Scope of support

Practical support across the development process.

Work can start with a new aircraft function, a supplier system, an equipment change or a review of an existing programme.

These activities overlap and inform each other. We agree the scope around your team’s responsibilities and the maturity of the design.

01 /Development assurance planning

Develop or review the plans that define the work, responsibilities, methods, supplier interfaces and expected evidence. Establish review milestones and the criteria for moving between development activities.

Coordinate development, safety, validation, verification, configuration management and process assurance planning, with clear arrangements for changes and deviations.

02 /Functions, requirements & architecture

Define intended functions, operating modes and system boundaries. Develop and review requirements, interfaces and architecture options, then allocate functions and requirements to the systems and items that implement them.

Maintain traceability and record the rationale for derived requirements, including their effects on higher level functions, safety and connected systems.

03 /Safety, supplier & item interfaces

Carry safety requirements and substantiated function and item development assurance levels (FDAL/IDAL) into development. Keep architectural independence, monitoring and shared resource assumptions visible to the teams responsible for implementation.

Coordinate system interfaces with software and electronic hardware assurance under DO-178C and DO-254, as applicable. Feed derived requirements, limitations, problems and verification evidence back into the system and safety processes.

04 /Requirements validation

Assess requirements for correctness, completeness and consistency. Consider normal and degraded operation, interfaces, safety needs and assumptions that still need confirmation.

Select appropriate reviews, analyses, simulations or tests to support the conclusions. Track validation evidence and assumption closure, including independent review where appropriate to the assurance level.

05 /Implementation verification & integration

Plan verification methods, procedures, acceptance criteria and coverage. Review the evidence from item, system and aircraft activities, including the basis for credit taken from supplier verification.

Address interactions between systems and the strategy for investigating unintended behaviour. Tie results to the tested or analysed configuration, record deficiencies and assess their implications before closing the verification record.

06 /Configuration & process assurance

Establish or review baselines, configuration identification, change control and problem reporting so the design and its evidence can be reconstructed.

Review whether activities and records follow the agreed plans. Document findings, deviations and their disposition, and bring the results together in a development assurance accomplishment summary.

07 /Modifications & equipment reuse

Assess how a change or new installation affects functions, interfaces, safety assumptions and existing evidence, including parts of the design that appear unchanged.

Establish which previous evidence remains applicable and define the additional development, validation and regression verification needed for the new application.

Safety findings inform requirements and architecture; implementation and verification evidence return to the safety assessments.

What the work produces

A clear record of the design and its evidence.

We develop or review the work products needed for your scope. The package is tailored to the programme; related content can be combined into coordinated documents and records.

Development & assurance plans
Development assurance planning, safety programme interfaces, and plans for validation, verification, configuration management and process assurance.
Requirements & architecture records
System descriptions, requirements specifications, interface definitions, allocation and traceability, with derived requirement rationale and assurance constraints.
Validation evidence
Validation plans, matrices, review or analysis records, assumption tracking and a validation summary supported by the underlying evidence.
Verification evidence
Verification plans, procedures, coverage matrices and results, with configuration references, problem dispositions and a verification summary.
Configuration, change & assurance records
Configuration indexes, baseline and change records, modification impact analyses, process assurance reviews and findings.
Development assurance accomplishment summary
The activities performed and evidence produced against the plans, including deviations, limitations and the assessed disposition of open problems.

Working together

Start with the work your team needs.

A focused engineering review

Review a requirements baseline, architecture, assurance plan or verification package. Identify material gaps, explain their implications and agree practical actions to resolve them.

Ongoing development support

Work alongside the engineering, safety and certification teams through the agreed activities, coordinating supplier inputs and keeping the evidence aligned as the design changes.

Tell us about the system.

Share its intended function, stage of development and the engineering or assurance question you need help with.