EASA Means of ComplianceFinal — current published edition checked

MOC SC-VTOL

Means of Compliance with SC-VTOL — Batch 1

Issue 2 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2

Source page 70 · PDF page 70

Means of Compliance with the Special Condition VTOL

Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021

Unless operational limitations are implemented to only allow operation in VFR Day with reliable weather reports on the absence of significant clouds, or the Operation in VFR is permitted with certified VTOL systems to detect the lightning strike or storm cells, then the likelihood of exposure to lightning in VMC condition has to be considered (see Figures 1 and 2 in Section 5). Nevertheless, the Hazard related to this exposure on VTOL aircraft could be assessed by comparing the Rate of lightning strike to Aircraft and the Safety objectives at Aircraft Level (see Table 3 in Section 5); in some cases, the probability of having a lightning strike to an aircraft is lower than the probability of having a failure from another technical cause. In such cases, the Hazard associated with a lightning strike can be considered to be unlikely and therefore for lower IEL Groups and the IEL Groups operating in VFR, VTOL.2515 (b) is not applicable for Level B and/or C systems that can be removed from the verification (see Section 6).

IEL Group I

(i) For level A Systems (Display and Non-Display)

(A) Follow the AMC 20-136; or (B) Conduct Equipment/System testing using the following categories:

According to the VTOL aircraft primary structure and wiring type,

choose the appropriate Category/Waveform at Level 3 in EUROCAE ED- 14G section 22. Fail/Pass Criteria: when subjected to the Lightning Environment, it

could be acceptable that equipment is/are subject to adverse effect, provided that the Level A function is maintained at the aircraft level and all the Equipment/Systems that are required in normal operation recover manually or automatically, in a timely manner, this function after the threat.

(ii) For Level B Systems on aircraft approved for IFR Operation

Conduct Equipment/System testing using the following categories:

(A) According to the VTOL aircraft primary structure and wiring type, choose the

appropriate Category/Waveform at Level 2 in EUROCAE ED-14G 22. (B) Fail/Pass Criteria; when submitted to the Lightning Environment, it could be

acceptable that redundant equipment is/are subject to adverse effect, provided that the Level B function is recovered manually or automatically, in a timely manner, after the threat.

IEL Group II

(i) For level A Systems (Display and Non-Display)

(A) Follow the AMC 20-136; or (B) Conduct Equipment/System testing using the following categories:

According to the VTOL aircraft primary structure and wiring type,

choose the appropriate Category/Waveform at Level 3 in EUROCAE ED- 14G section 22.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.