EASA Means of ComplianceFinal — current published edition checked

MOC SC-VTOL

Means of Compliance with SC-VTOL — Batch 1

Issue 2 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2

Source page 65 · PDF page 65

Means of Compliance with the Special Condition VTOL

Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021

recorded in the relevant SSA. In case of double failures, with either one or both hidden, that can lead to Catastrophic or Hazardous Failure Condition, no credit should be taken from MTBF for failure detection, and the maintenance task enabling detection of the hidden failure should be identified as a required maintenance task.

MOC VTOL.2515 Electrical and electronic system lightning protection

Unlikely Exposure to Lightning

It is stated in VTOL.2515 that sub paragraphs (a) and (b) are applicable “unless it is shown that the exposure to lightning is unlikely”. The demonstration on this condition should be based on reliable meteorological reports and/or on-board means to detect lightning, directly or indirectly (e.g. Lightning Detector, Weather Radar). Therefore, an accepted means to avoid the compliance demonstration with electrical and electronic system lightning protection requirements is to establish the following operational limitations:

(a) VFR Day with reliable weather reports stating the absence of significant clouds before and/or during the

flight for departure, enroute, terminal and diversion vertiports, or (b) VFR with means to detect lightning or storm cells via a certified onboard system, and/or ground base

support plus appropriate communication with the pilot. The qualification of such ground-based system should be ensured by the operator.

When VTOL.2515 (a) and (b) are applicable, this MOC proposes simplified methods for addressing the Indirect Effects of Lightning (IEL) compliance demonstration on VTOL aircraft. These methods vary depending on the VTOL Aircraft categories; Basic 1 (0 to 1 passenger), Basic 2 (2 to 6 passengers), Basic 3 (7 to 9 passengers) and Enhanced.

Reference Documents

The following references are quoted in different sections of this MOC as a source of additional information or to provide accepted methods and practices:

(a) Industry Standards

ASTM

F3061/F3061M Specification for Systems and Equipment in Small Aircraft F3230 Standard Practice for Safety Assessment of Systems and Equipment in Small Aircraft F3309 Standard Practice for Simplified Safety Assessment of Systems and Equipment in Small Aircraft

EUROCAE/SAE/RTCA

ED-81/ARP5413A Certification of an Aircraft Electrical/Electronic Systems for the Indirect Effect of Lightning ED-84/ARP5412B Aircraft Lightning Environment and Related Test Waveforms ED-91/ARP5414B Aircraft Lightning Zoning ED-105/ARP5416A Aircraft Lightning Test Methods

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.