EASA Means of ComplianceFinal — current published edition checked

MOC SC-VTOL

Means of Compliance with SC-VTOL — Batch 1

Issue 2 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2

Source page 63 · PDF page 63

Means of Compliance with the Special Condition VTOL

Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021

(ii) if some are ‘derived requirements’, a mechanism is in place to properly identify, validate

and verify those derived software high-level requirements as described in ED- 79A/ARP4754A section 5.4.

Note: In both cases, the system-level processes are not considered to be software development assurance processes.

(d) Airborne Electronic Hardware development assurance

This MOC recognises AMC 20-152( ) as accepted means of compliance for requirement VTOL.2510(a).

(e) Open Problem Report management

This MOC recognises AMC 20-189( ) as accepted means of compliance for establishing an open problem report management process for the system, software and AEH domains.

(f) Considerations on derived requirements

ED-79A/ARP4754A section 5.3.1.4 adequately addresses the concerns related to potential for errors introduced by derived requirements while designing and implementing the systems

However, if ED-79A/ARP4754A section 5.3.1.4 defines the derived requirements as those that “may not be uniquely related to a higher-level requirement “, the definition could create an ambiguity as it is limited to “Additional requirements resulting from design or implementation decisions during the development process which are not directly traceable to higher-level requirements”.

Requirements that trace to a higher-level requirement and add a behaviour that is not specified at a higher level should also be considered as derived.

As a consequence, the definition from ED-79A/ARP4754A is superseded by the definition provided in Section 4 of this document.

Considerations for highly integrated systems

(a) Generic guidance

When aircraft functions are provided by a combination of systems, the relevant requirements of those systems should be validated together, including the following activities:

(i) Analysis of the potential interactions and interferences between systems, (ii) Planning of dedicated activities at system and aircraft levels to ensure validation of

those requirements that are affected by interactions or interference.

When incorporating multiple functions into the same system or equipment, applicability of AMC 20-170 should be considered. For architectures with no partitioning, particular care should be taken in the analysis of interactions between functions.

(b) Additional Considerations for the Lift/Thrust system

For most VTOL aircraft designs, the Flight Control System and the Lift/Thrust system are highly integrated, i.e. the propulsion system directly contributes to the controllability of the aircraft. Therefore the development of the Lift/Thrust system should take into consideration the safety objectives of Section 8 and should follow the provisions of VTOL.2510 and associated guidance.

View figures, tables and original page layoutOriginal source page Source page 63 · PDF page 63 of MOC SC-VTOL

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.