MOC SC-VTOL
Means of Compliance with SC-VTOL — Batch 1
Issue 2 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2
Means of Compliance with the Special Condition VTOL
Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021
provided the Level A function is maintained at the aircraft level and all the Equipment/Systems required in normal operation recover manually or automatically, in a timely manner, this function after the threat.
(iii) For Level B Systems:
(A) Follow the AMC 20-158 (by using Equipment HIRF Test Levels 1 or 2 as defined in
Section 5); or (B) Conduct Equipment/System testing as defined in (d) (3) (ii) (a) and (b); when
submitted to the HIRF Environment, if the Equipment/System, subject to adverse effects, does not to recover to its level B function after the threat, the method proposed by the AMC 20-158 for Level B systems in (d) (3) (iii) (A) can be used as an alternative.
(iv) For Level C Systems:
(A) Follow the AMC 20-158 (by using Equipment HIRF Test Level 3 as defined in Section
5); or (B) Conduct Equipment/System testing as defined in (d) (3) (ii) (a) and (b); when
submitted to the HIRF Environment, if the Equipment/System, subject to adverse effects, does not to recover to its level C function after the threat, the method proposed by the AMC 20-158 for Level C systems in (d) (3) (iv)(A) can be used as an alternative.
HIRF Testing for Level A systems considerations;
(i) The Test Levels for upper HIRF Group can also be used for lower HIRF Groups; for
instance the use of real transfer function and attenuation curves and/or more severe External HIRF Environment can be used for Level A Systems of HIRF Groups I/II. (ii) Equipment testing is acceptable when it is shown that the interdependencies between
equipment performing a function are understood and each equipment is tested and monitored to verify that there are no unacceptable upsets of the function. (iii) If similar equipment are used to perform the same function; the test can be limited to
a single equipment.
Level A System architecture consideration; when a Level A system comprises redundant channels/equipment that perform the same level A function, it is permitted to limit the system to the channels/equipment that are required in normal operation provided that they are not susceptible when they comply with VTOL.2520(a); for instance if it is demonstrated that the primary channels comply with VTOL.2520(a) without the support of the back-up channel, this channel is not requested to be exposed to the HIRF Environment I/III, however this back-up channel should be considered to be a level B system.
HIRF Environments and Equipment HIRF Test Levels
This Section specifies the HIRF environments and equipment HIRF test levels for electrical and electronic systems under VTOL.2520.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source