MOC SC-VTOL
Means of Compliance with SC-VTOL — Batch 1
Issue 2 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2
Means of Compliance with the Special Condition VTOL
Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021
FREQUENCY FIELD STRENGTH (V/m)
PEAK
AVERAGE
400 MHz - 1 GHz 700 40
1 GHz - 2 GHz 1300 160
2 GHz - 4 GHz 3000 120
4 GHz - 6 GHz 3000 160
6 GHz - 8 GHz 400 170
8 GHz - 12 GHz 1230 230
12 GHz – 18 GHz 730 190
18 GHz - 40 GHz 600 150
In this table, the higher field strength applies at the frequency band edges.
(c) HIRF environment III is specified in the following Table 5:
Table 5 — HIRF Environment III
FREQUENCY FIELD STRENGTH (V/m)
PEAK
AVERAGE
10 kHz – 100 kHz 150 150
100 kHz - 400 MHz 200 200
400 MHz - 700 MHz 730 200
700 MHz – 1 GHz 1400 240
1 GHz - 2 GHz 5000 250
2 GHz - 4 GHz 6000 490
4 GHz - 6 GHz 7200 400
6 GHz - 8 GHz 1100 170
8 GHz - 12 GHz 5000 330
12 GHz – 18 GHz 2000 330
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source