EASA Means of ComplianceFinal — current published edition checked

MOC SC-VTOL

Means of Compliance with SC-VTOL — Batch 1

Issue 2 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2

Source page 54 · PDF page 54

Means of Compliance with the Special Condition VTOL

Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021

installation hazard assessment” will be addressed through the requirements VTOL.2500 and VTOL.2510 of Subpart F.

This MOC does not cover “Airworthiness Security” aspects. Interactions and interfaces between the system safety assessment process and the security assessment process exist however. Therefore, should a function be implemented or a system/equipment installed on the aircraft as a result of the airworthiness security assessment process, this function or system/equipment needs to undergo the system safety assessment process.

Reference Documents

The following references are quoted in different sections of this MOC as a source of additional guidance:

(a) EUROCAE ED-79A/ARP4754A, Guidelines for development of civil aircraft and systems (b) SAE ARP4761, Guidelines and methods for conducting the safety assessment process on civil airborne

systems and equipment. (c) AMC 20-115( ), Airborne Software Development Assurance Using EUROCAE ED-12 and RTCA DO-178. (d) AMC 20-152( ), Development Assurance in Airborne Electronic Hardware (AEH) (e) AMC 20-189( ), Management of Open Problem Reports. (f) AMC 25-19 Amdt. 24, Certification Maintenance Requirements

Definitions

(a) Complexity: An attribute of functions, systems or items which makes their operation, failure modes or

failure effects difficult to comprehend without the aid of analytical methods. (Source: ED- 79A/ARP4754A). (b) Continued Safe Flight and Landing: see MOC to VTOL.2000 Applicability and definitions. (c) Controlled emergency landing: see MOC to VTOL.2000 Applicability and definitions. (d) Commercial-Off-The-Shelf (COTS) software: Commercially available applications that are sold by

vendors through public catalogue listings. COTS software is not intended to be customised or enhanced. Contract-negotiated software developed for a specific application is not COTS software (Source: ED- 12C/DO-178C). (e) Derived requirements: Additional requirements resulting from design or implementation decisions

during the development process which are not directly traceable to higher-level requirements and/or specify behaviour beyond that specified by the higher level requirements (Source: adapted from ED- 79A/ARP4754A and ED-12C/DO-178C). (f) Development Assurance: All of those planned and systematic actions used to substantiate, at an

adequate level of confidence, that errors in requirements, design and implementation have been identified and corrected such that the system satisfies the applicable certification basis. (Source: ED- 79A/ARP4754A). (g) Development Assurance Level (DAL): the level of rigor of development assurance tasks necessary to

demonstrate compliance with paragraphs VTOL.2500 and VTOL.2510 (Source: adapted from ED79A/ARP4754A). The DALs are determined by the system safety assessment process.

Two types of development assurance levels are identified in this document:

FDAL: Development Assurance Levels for aircraft functions, systems and equipment IDAL: Development Assurance Levels for software and electronic hardware items

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.