MOC SC-VTOL
Means of Compliance with SC-VTOL — Batch 1
Issue 2 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2
Means of Compliance with the Special Condition VTOL
Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021
MOC – SUBPART C – STRUCTURES
MOC VTOL.2200 Structural design envelope
The following design values and limitations should be established to show compliance with the structural requirements of this Subpart, for each aircraft configuration or flight mode, as appropriate:
(Note: Failure conditions need not be taken into account when defining these design values and limitations.)
(a) The design maximum and design minimum weights. (b) The lift/thrust units design rpm ranges with power on and power off, if applicable. These design values
should provide adequate margin to accommodate the variations in rpm speed occurring in any manoeuvre. (c) Design Airspeeds:
Maximum level flight speed, VH. The maximum level flight speed at maximum continuous power; Maximum Design speed, VD. Never-Exceed speed, VNE. VNE should not be greater than 0.9 times VD. Velocity of Normal Operations, VNO is the maximum structural cruising speed. VNO should be defined by the applicant and should be less than or equal to VH and VNE Maximum design rearward and sideward flight speeds. The maximum design rearward and sideward speeds should be defined to be no less than 1.11 times the maximum permitted rearward and sideward speeds. Design speed for maximum gust intensity, VB (for Category Enhanced). For VB, the following applies:
(A) VB should not be less than the speed determined by the intersection of the line
representing the maximum positive lift CN MAX and the line representing the rough air gust velocity on the gust V-n diagram, or VS1√ng , whichever is less, where –
ng the positive aircraft gust load factor due to gust, at speed VNO, and at
the particular weight under consideration; and VS1 is the stalling speed with the flaps retracted at the particular weight
under consideration.
(B) VB need not be greater than VNO. (C) If loss of control due to stall is not possible, or definition of VB in accordance with
(A) is not applicable, VB should be defined according to the VTOL operating limit for flight in turbulent conditions.
(d) The centre of gravity limits corresponding to the configuration of the aircraft. (e) The rotational speed ratios between each lift/thrust unit and each connected rotating component, as
applicable. (f) The positive and negative limit manoeuvring load factors should be defined based on the maximum
capability of the aircraft, taking into account the flight control system (without failure cases), for which:
The probability of being exceeded is shown by analysis to be extremely improbable within the design altitude and temperature range;
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source