EASA Means of ComplianceFinal — current published edition checked

MOC SC-VTOL

Means of Compliance with SC-VTOL — Batch 1

Issue 2 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2

Source page 64 · PDF page 64

Means of Compliance with the Special Condition VTOL

Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021

Latent failure considerations

The use of periodic maintenance or flight crew checks to detect significant latent failures when they occur is undesirable and should not be used in lieu of practical and reliable failure monitoring and indications. Significant latent failures are latent failures that would, in combination with one or more specific failure(s) or event(s), result in a Hazardous or Catastrophic failure condition and should be avoided in system design.

Within the frame of the no single failure criterion, dual failure combinations, with either one latent, that can lead to a Catastrophic Failure Condition should be avoided in system design. Any such combinations should be highlighted in the relevant SSA and discussed with EASA as early as possible after identification.

Additional considerations may be appropriate for some specific systems and functions. In particular for Fly-by- wire Flight Control Functions, MOC 5 VTOL.2300 applies.

Flight Crew and Maintenance considerations

(a) Flight Crew actions

When assessing the ability of the flight crew to cope with a failure condition, the information that is provided to the flight crew and the complexity of the required action should be considered. If the evaluation indicates that a potential failure condition can be alleviated or overcome during the time available without jeopardizing other safety related flight crew tasks and without requiring exceptional pilot skill or strength, credit may be taken for correct and appropriate corrective action for both qualitative and quantitative assessments. Similarly, credit may be taken for correct flight crew performance if overall flight crew workload during the time available is not excessive and if the tasks do not require exceptional pilot skill or strength. Unless flight crew actions are accepted as normal airmanship, the appropriate procedures should be included in the EASA-approved AFM or in the AFM revision or supplement. The AFM should include procedures for operation of complex systems such as integrated flight guidance and control systems. These procedures should include proper pilot response to cockpit indications, diagnosis of system failures, discussion of possible pilot-induced flight control system problems, and use of the system in a safe manner.

(b) Maintenance actions

Credit may be taken for the correct accomplishment of maintenance tasks in both qualitative and quantitative assessments if the tasks are evaluated and found to be reasonable. Required maintenance tasks, which mitigate hazards, should be provided for use in EASA-approved ICA. Annunciated failures that will be corrected before the next flight or a maximum duration should be established before a maintenance action is required. If the latter is acceptable, the analysis should establish the maximum allowable interval before the maintenance action is required. A scheduled maintenance task may detect latent failures. If this approach is taken, and the failure condition is hazardous or catastrophic, then a maintenance task should be established. The process for the identification and selection of these scheduled maintenance tasks requires early coordination and agreement with EASA. Guidance may be found in AMC 25-19. Credit could be given to tests performed due to mean time between failures (MTBF) to detect the presence of hidden failures, if it can be ascertained that the equipment is removed and inspected at a rate much more frequent than the safety analysis requires. This credit should be substantiated in the relevant SSA. The means of detection of the hidden failures should be clearly identified, either at the opportunity of the acceptance tests performed before the equipment enters service or leaves the manufacturer, or at the opportunity of test of system integrity when it is installed back on the aircraft. This substantiation should be

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.