MOC SC-VTOL
Means of Compliance with SC-VTOL — Batch 1
Issue 2 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2
Means of Compliance with the Special Condition VTOL
Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021
Due to the similar approach in the safety assessment process related to IEL and HIRF, the System Certification Levels for HIRF and Lightning are usually the same.
(d) HIRF Compliance Verification
By applying the ‘Net Safety Benefit’ approach1 on the lower HIRF Group, VTOL.2520 (b) is not applicable for level C system of HIRF Groups I and II, it could be removed from the Compliance Verification. HIRF Groups I and II
(i) For Level A Non-Display Systems:
(A) Follow AMC 20-158; or (B) Conduct Equipment/System testing using the following default levels:
Conducted susceptibility testing with the Generic transfer function for
aircraft (according to VTOL shape and size) extrapolated to the HIRF Environment III (as defined in Section 5) corresponding to the EUROCAE ED-14G section 20 categories Y or W. Radiated Susceptibility testing with Generic attenuation curves
(depending on equipment location) extrapolated to the HIRF Environment III (as defined in Section 5) corresponding to the EUROCAE ED-14G section 20 categories L, G or F Fail/Pass Criteria; when subjected to the HIRF Environment, it could be
acceptable that redundant equipment is/are subject to adverse effects, provided that the Level A function is maintained at the aircraft level and all the Equipment/Systems that are required in normal operation recover manually or automatically, in a timely manner, this function after the threat.
(ii) For Level A Display Systems:
(A) Follow the AMC 20-158; or (B) Conduct Equipment/System testing using the following default levels:
Conducted susceptibility testing ?with the Generic transfer function for
aircraft (according to VTOL shape and size) extrapolated to the HIRF Environment I (as defined in Section 5) corresponding to the EUROCAE ED-14G section 20 categories O or M. Radiated Susceptibility testing with Generic attenuation curves
(depending on equipment location) extrapolated to the HIRF Environment I (as defined in Section 5) corresponding to the EUROCAE ED-14G section 20 categories G, F or D. Fail/Pass Criteria; when subjected to the HIRF Environment, it could be
acceptable that redundant equipment is/are subject to adverse effects, provided that the Level A function is maintained at the aircraft level and all the Equipment/Systems that are required in normal operation
1 For additional information, refer to the EASA Proposed Certification Memorandum CM-SA-001 published in the EASA Website: Proposed Certification Memorandum CM-SA-001 - Net Safety Benefit - Issue 01 | EASA (europa.eu)
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source