EASA Means of ComplianceFinal — current published edition checked

MOC SC-VTOL

Means of Compliance with SC-VTOL — Batch 1

Issue 2 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2

Source page 68 · PDF page 68

Means of Compliance with the Special Condition VTOL

Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021

Additional considerations for wiring protection can be found in ED-158 A (User’s Manual for certification of aircraft electrical/Electronic Systems for the Indirect Effect of Lightning).

(b) IEL Group Determination

The IEL Group should be identified by using Table 1; the relevant Group will determine the IEL Compliance Verification method given in paragraph (d).

VTOL Categories Basic (max passenger seating

configuration)

Enhanced 0-1 2-6 7-9 IEL Group I II III III Table 1 – IEL Group Allocation

(c) IEL Safety Assessment

Aircraft systems that require an IEL Safety Assessment should be identified. The elements of the system that perform a function should be defined, considering redundant and/or backup equipment that constitutes the system. The process used for identifying these systems should be similar to the process used for showing compliance with VTOL.2510. This requirement addresses any system failure that may cause or contribute to an effect on the safety of flight of an aircraft. The effects of a Lightning Strike should be assessed to determine the degree to which the aircraft and its systems safety may be affected. The operation of the aircraft systems should be assessed separately and in combination with, or in relation to, other systems. This assessment should cover:

(i) All normal aircraft operating modes, stages of flight, and operating conditions; (ii) All failure conditions and their subsequent effect on aircraft operations and the flight

crew; and (iii) Any corrective actions required by the flight crew.

A safety assessment related to IEL should be performed to establish and classify the equipment or system failure condition. Table 2 provides the corresponding Failure Condition classification and system IEL certification level for VTOL.2515. The IEL safety assessment determines the consequences of failures, due to IEL, for the aircraft functions that are performed by the system. The Lightning Certification Level (LCL) classification assigned to the system and functions can be different from the Design Assurance Levels assigned for equipment function and/or item (software, and complex electronic hardware). This is because operation in Lightning environment can cause common cause effects. The term ‘Design Assurance Level’ should not be used to describe the Lightning Certification Level because of the potential differences in assigned classifications for software, complex electronic hardware, and equipment function

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.