MOC SC-VTOL
Means of Compliance with SC-VTOL — Batch 1
Issue 2 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2
Means of Compliance with the Special Condition VTOL
Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021
Determination of Control System Jam Positions. The flight phases required to be addressed should cover all flight phases (e.g. vertical takeoff, transition, in-flight (climb, cruise, normal turns, descent, and approach), transition and, vertical landing). Additional phases specific to the aircraft, such as hover should also be considered. Methodology:
When showing compliance with VTOL.2300(a)(2), the applicant should:
(i) provide a summary of the design features that are intended to prevent a jam from
occurring, due to failure or physical interference (jam prevention means), (ii) provide a summary of the means by which a jam could be alleviated (jam alleviation
means),
Note: if credit is taken from a jam alleviation device (e.g. jam breakout or override, disconnect means, alternate surface control, alternate power source, or alternate cable paths), then the conditional probability of failure of the jam alleviation device, given that jam has occurred, should be less than 1 x 10-3. (iii) For each axis and flight phase:
(A) determine the ‘normally encountered position’.
This ‘normally encountered position’ is the maximum position resulting from reasonably expected manoeuvres, gust/manoeuvre load alleviation function commands and wind & gust conditions. As an example, assuming a jam to be approximately 1 x 10-6 to 1 x 10-7 per flight hour, a reasonable definition of normally encountered positions would represent the range of control surface deflections (from neutral to the largest deflection) expected to occur in 1000 random operational flights, without considering other failures, for each of the flight segments identified in the rule. This assumption should be supported by FMEA/SSA expected failure rates for jams. NOTE 1:
If there is significant uncertainty regarding the control surface positions during 1000 random operational flights, it is acceptable to use the control surface stop or to propose another position based on conservative assumptions for acceptance by EASA. NOTE 2:
Similarly to NOTE 1 above, the 1000 random operation flights is based on the assumption of a jam to be approximately 1 x 10-6 to 1 x 10-7 per flight hour. This is actually dependent on the actuator technology, installation, aircraft manufacturer and supplier experience. The Applicant should therefore propose a conservative analysis to cover the risk that is foreseen.
(B) evaluate the jam at positions up to and including the normally encountered position,
and demonstrate continued safe flight and landing in the Category Enhanced or controlled emergency landing in the Category Basic including structural strength capability.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source