MOC SC-VTOL
Means of Compliance with SC-VTOL — Batch 1
Issue 2 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 1 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Initial final means of compliance with SC-VTOL. Later final MoC batches supplement or amend specific provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: db12643dc7ceea42b40a49945615bf06cf39e0f2e6743090241a00eafca7a8a2
Means of Compliance with the Special Condition VTOL
Doc. No: MOC SC-VTOL Issue: 2 Date: 12 May 2021
Finally, it is recognised that the experience gained during the certification of these new products and their entry into service will allow to increase the knowledge in their certification. It is possible that a better insight into the particular characteristics of these products is gained, which might result in modifications of particular elements of the first MOCs that are issued. EASA will do so considering first and foremost the safety of the European citizens but also mindful of the effects on all stakeholders.
Note: For ease of interpretation, grey shading has been used this document to indicate where additions or substitutions have been made to the text of the proposed means of compliance (issue 1). Deleted text is only marked through the revision bars on the left-hand side of the document.
Log of issues
Issue Issue date Change description
1 25/05/2020 First Issue for Public Consultation
2 12/05/2021
Modified in consideration of the comments received in the public consultation that was open from May 25, 2020 to July 27, 2020. Refer to the published CRD for the details.
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source