Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 17 · PDF page 17

(3) Use of Designees. (Corresponds to section IX in Figure 2-4.) Identify all FAA designees you expect to participate in the project. The list may include designated manufacturing inspection representatives (DMIR), designated airworthiness representatives (DAR), and designated engineering representatives (DER). List each designee by name and include the designee’s number, specialty, point of contact (if necessary), FAA home office, and level of authority. Identify the function or specific compliance determination that each designee will perform as part of the certification plan.

(4) Continued Airworthiness Requirements. (Corresponds to section X in Figure 2-4.) As an STC holder, you must provide ICA to those persons or agencies required to comply with the methods, techniques, and practices in them. The ICA need only address continued airworthiness with respect to the design change for which application was made, and parts or areas affected by the design change. An aircraft may not be approved for return to service until we have accepted the ICA.

e. In addition to the certification plan, you must complete a conformity plan. The conformity plan can be submitted at a later date, but prior to any actual conformity taking place. This conformity plan is a general overview of the project: a list of focal points, description of inspection systems in place and inspection procedures used for conformity inspections, identification and tracking of conformity inspections, description of the conformity inspections, and the plan for airworthiness certification and aircraft return to service at project completion.

f. You are responsible for meeting the milestones set in the certification plan schedule. Any slippage in the milestone dates may result in a program delay. For the project to proceed as efficiently as possible, we strongly encourage you to coordinate schedule changes with us as soon as possible.

2-9. FAA Establishes a Project.

a. When we accept an STC application, we will establish a project and assign a project manager. After receiving the application and certification plan, the project manager will send you an acknowledgment. The acknowledgment and response will identify the project number, project manager and other members of the FAA certification team, including engineers, flight test personnel, AEG personnel, manufacturing inspection personnel, directorate project officer, and any other team members. The response will also indicate a date for a project initiation meeting as appropriate.

b. We will review your certification plan and concur if it’s satisfactory. If it’s not, we will comment on it or suggest modifications. We will accept the certification plan when the information sufficiently outlines a program to demonstrating compliance with the certification basis by analysis and, if required, by testing (see par. 2-11.). The plan will present your certification procedures and schedule for accomplishing the project.

c. For systems that contain software, prepare a plan for software aspects of the

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.