AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
approvals when the manufacturing facilities are located outside the United States, unless the Administrator finds that the location of the manufacturer's facilities places no undue burden on the FAA.
1-10. STC Project Management. Effective management by both you and us is essential to successful completion of an STC certification project. In addition to this AC, we and the aviation industry jointly developed the FAA and Industry Guide to Product Certification (“the CPI Guide”) to help you lay a foundation from which to build mutual trust, leadership, teamwork, and efficient business practices. The processes and products described in the CPI Guide enable both you and us to fulfill our respective roles and expedite the certification process while still focusing on significant safety issues. The Guide is available on the internet at: http://www.faa.gov/aircraft/air_cert/design_approvals/media/CPI_guide_II.pdf.
a. The CPI Guide describes how to plan, manage and document an effective, efficient product certification process. It describes the working relationship between us and the applicant. Although focused on large or complex projects, the Guide’s principles of up front planning, project management, and documenting the certification process and working relationship are applicable to all applicants and all projects, large or small.
b. Use of the Guide’s principles enables planning and mutual commitment between the FAA and an applicant. Both parties should agree on what certification activities each will accomplish and how the activities will be conducted. Both parties establish a certification plan. Employing the guidance provided in this Advisory Circular will help to efficiently plan the certification project. It will enable both the FAA and the applicant to agree upon the expectations and certification activities for which each will be responsible. Chapter 2 will discuss each phase of managing a certification project in more detail. See the Guide for a complete description of the six-phase approach to managing a certification project.
1-11. FAA Project Team.
a. The FAA certification project team is the working level group at the ACO that works with you, conducts the certification project, and makes the findings of compliance. We will assign a project manager and establish a certification project team for each STC project. A generic project team normally consists of the following:
(1) A project manager,
(2) Engineers or technical specialists in each required discipline based on the
project,
(3) Flight test pilots and flight test engineers,
(4) Manufacturing inspectors,
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source