FAA Advisory circularActive

AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 20 · PDF page 20

g. To expedite agreement on the approval of a completed certification plan or PSCP, develop your test article and schedule data into a conformity plan that the ACO and MIDO can accept with minimal further development. While we encourage your involvement in the conformity plan, we retain the right to make the necessary inspections to determine compliance with the applicable 14 CFR requirements. Therefore, we are responsible for the final content of the plan.

2-14. Using Parts Produced by Technical Standard Order (TSO) Authorization or Parts Manufacturer Approval (PMA) in Certification Testing. Either a Technical Standard Order Authorization (TSOA) or PMA indicates that the FAA has determined that the part produced thereunder conforms to a specifically defined FAA-approved design, and that any deviations from that approved design have been found to have no effect on form, fit, or function of the article. According to 14 CFR § 21.601(b)(4), an article manufactured under a TSOA is an FAA-approved article or appliance for the purpose of meeting the regulations of this chapter that require the article to be approved. For parts produced under a PMA, the corresponding regulatory definition for the fabrication inspection system is 14 CFR § 21.303(h). Marking the part according to 14 CFR § 45.15 also indicates that a part meets the FAA-approved design. For parts approved by TSOA or PMA, part conformity will not be necessary for its use in a certification project.

Note: TSO articles must have separate approval for installation in an aircraft. The article may be installed only if performed under 14 CFR part 43 or the applicable airworthiness requirements. It is the responsibility of those installing the article either on or within a specific type or class of aircraft to determine that the aircraft installation conditions are within the TSO standards. As part of the STC process certain functionality aspects will need to be tested/evaluated, particularly since we have new advanced avionics with extra features and functions not specified in the TSO that will require evaluation as part of the STC process.

2-15. COMPLETED (PROJECT SPECIFIC) CERTIFICATION PLAN. By now, the details of your plan for showing compliance, including the remaining elements outlined in paragraph 2-6 above should be captured by you in the certification plan. From this information, our certification team will determine that, if the plan was successfully executed, its results would show compliance. The amount of detail necessary will vary from finding to finding, but, in general, it decreases when you choose common means of compliance, such as those described in ACs. The certification team should find the plan agreeable before processing conformity requests, approving test plans, witnessing or observing certification tests, or performing any other certification project activities, to ensure that they and you are working with the same fundamental understanding of the certification data.

2-16. Interim Type Certification Board (TCB) Meeting for (Project Specific) Certification Plan Agreement. The TCB meeting establishes consensus on all integrated certification planning. During this meeting, the applicant and the FAA use the PSCP or the certification plan to assess the certification risks of proceeding toward showing and finding compliance. We obtain mutual agreement to the adequacy of the plan and acceptance of the risks before implementation. Our certification team may hold one main interim TCB meeting

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.