FAA Advisory circularActive

AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 43 · PDF page 43

Figure 2-5. Sample Applicant Compliance Checklist Format, continued

applicant cannot show literal compliance with a regulation, but shows to FAA satisfaction that compensating factors achieve a safety level equal to that of the applicable regulation. Applicant may propose the use of an ELOS in writing to the ACO. FAA makes the finding of equivalency and issues the ELOS memo if satisfied. If proposing an ELOS for a given regulation, enter the reference for the proposal letter into the checklist under the “Plan, Drawing, Report Number” column for the regulation (see subparagraph “.o.”) and on the last page of the checklist under the “EQUIVALENT LEVELS OF SAFETY (ELOS):” heading. Make all proposals for ELOSs to the ACO early in the project to allow time for processing.

(7) Petition for Exemption (PExmpt) –CFR § 11.15 defines a petition for exemption as “…a request to the FAA by an individual or entity asking for relief from the requirements of a current regulation.” Petitions for exemptions are rulemaking as described in 14 CFR part 11 and are subject to a public review process outside the scope of this AC. If you petition for exemption from a given regulation, enter the reference for the petition letter into the “Plan, Drawing, Report Number” column for the regulation (see subparagraph “o.”) and on the last page of the checklist under the “EXEMPTIONS:” heading. Make all petitions for exemption to the ACO early in the project to allow time for processing.

(8) Not Applicable (N/A) – Means the specific regulation does not apply to the design or modification for this STC; therefore, a showing of compliance is not necessary. Enter the reason the rule is not applicable in the “Applicable Guidance, References, and Remarks” column of the checklist described in subparagraph “.q.” below.

o. Enter the plan, drawing, and report numbers used to document the showing of compliance with the regulation. The items referenced here should contain enough detail to show compliance to the regulation.

p. Enter the name and designee number (as applicable) of the person or entity that will find or recommend compliance with each of the applicable regulations. This could be a designee (designated engineering representatives (DER), designated alteration stations (DAS), delegated option authorization) or the FAA. We encourage applicants to use designees. More information on designees is on the Internet at www.faa.gov/other_visit/aviation_industry/designees_delegations. Consultant DERs typically provide their services to applicants for a fee. A directory of DERs is available in AC 183.29-1, Designated Engineering Representatives. See an updated electronic directory and more information on DERs on the Internet at www.faa.gov/other_visit/aviation_industry/designees_delegations/find_designees/. Get designee concurrence before submitting the checklist to the ACO.

q. Enter the guidance followed plus other references and remarks clarifying how you are showing compliance with the applicable regulations. If entering N/A for Method of

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.