AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
CHAPTER 8. TESTS
8-1. General. Depending on how complex the project is, we may require several types of testing for an STC. Before any certification testing, we or our DER must have approved the test plan and the test article must have a complete part and installation conformity inspection. See chapter 6.
8-2. Component Tests. Before completing the modification or installation, you may have to verify by testing that certain detail parts, components, or subassemblies meet the applicable regulations. Submit a test plan for each certification test to us for review to preclude unnecessary or unacceptable tests. Upon approval of the test plan, the FAA project engineer will issue FAA Form 8120-10, Request for Conformity, for inspection on the test fixture and test article(s) to the MIDO. The MIDO (or designee) will do the conformity inspection. The tests should then be witnessed by either the FAA project engineer or an authorized DER.
8-3. Ground Tests.
a. You may have to complete electromagnetic interference (EMI), environmental, fuel flow, structural, or similar ground tests when the modification or installation is complete. Submit a test plan for all such tests to us for review and approval before testing. See chapter 7.
b. Aircraft that employ electronic engine controls, commonly named full authority digital electronic/engine controls (FADEC), are recognized to be more susceptible to EMI than aircraft with only manual (non-electronic) controls. For this reason, you must demonstrate that the critical function components of the system under consideration, continue to perform their intended function during and after exposure to required electromagnetic fields. We may accept deviations from system specifications, but those must be independently assessed by the FAA/DER on a case-by-case basis.
8-4. Flight Tests.
a. Applicant flight testing happens before we issue the TIA. We will review your flight test reports, and repeat some or all of the tests as necessary. Those tests we repeat will be identified and performed per the TIA.
b. We will perform flight tests for modifications which could affect the aircraft’s performance, flight characteristics, powerplant operation, and/or overall handling qualities. Changes to systems, equipment, instrumentation, and flight manuals may also require flight tests. Any modification which may affect the noise signature and/or navigation of the aircraft (including performance changes) will usually require fight testing. The FAA project engineer can give you general information on the types of tests that may be required.
Note: Our successful completion of the TIA tests is one of the final steps to STC issuance.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source