FAA Advisory circularActive

AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 23 · PDF page 23

all testing. Identify components and assemblies requiring conformity, including the test fixture and equipment.

c. We will coordinate project related work only with you or your authorized agent identified on the STC application, FAA Form 8110-12, unless otherwise indicated in a specific authorization. You are responsible for coordinating any FAA requests with your vendors and subcontractors.

d. After we review the data and determine that it shows compliance with the certification basis, the project manager will notify you that we accepted the data.

2-20. Conformity Inspections. Conformity inspections verify and provide objective documentation that the test articles, parts, assemblies, installations, functions, and test setups conform to the design data. 14 CFR § 21.33(a) requires you to allow us to conduct any conformity inspections we choose during the type certification process. FAA engineering personnel are responsible for determining the need to conduct conformity inspections, and then for requesting that the project MIDO do the required inspections. Because the conformity process is so complex and parts conformity inspections need to be made early in the certification project, consult your project MIDO early about inspections. This ensures the necessary inspections are scheduled at appropriate times. Our manufacturing inspector, or authorized designee(s) will conduct all necessary conformity inspections, verifying that the product conforms to the drawings, specifications, and special processes. The FAA conformity inspection must be successfully accomplished before any certification ground or flight tests are conducted (all completed and signed FAA forms 8100-1, Conformity Inspection Record, must be submitted to the ACO project manager prior to any official certification ground or flight testing).

a. 14 CFR § 21.33(b) says, “Each applicant must make all inspections and tests necessary to determine:

(1) Compliance with the applicable airworthiness, aircraft noise, fuel venting, and exhaust emission requirements,

(2) Materials and products conform to the specifications in the type design,

(3) Parts of the products conform to the drawings in the type design, and

(4) The manufacturing processes, construction, and assembly conform to those specified in the type design.”

b. Submit FAA Form 8130-9, Statement of Conformity, attesting that the articles conform to the proposed design. We should receive these forms from you before doing any FAA conformity inspections. This is the way that the applicant attests that the test articles conform to the proposed type design (see 14 CFR § 21.53(b)).

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.