AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
to agree on how to conduct the project, followed by splinter meetings among our specialized staff to address the certification activities required for the various systems, disciplines, or components of the product design. The TCB meeting for certification plan agreement concludes with the completion of the splinter meetings. Your ACO uses an interim TCB meeting to establish agreement with the certification plan when the following happens:
a. The project requires significant coordination of resources,
b. A face-to-face meeting will help all involved parties understand how compliance will be shown,
c. You or the ACO may ask for one,
d. Certification plan issues need FAA management visibility,
e. The project manager wants to encourage teamwork within the FAA and with you,
f. Many of your comments and questions could be more efficiently addressed in person, and
g. We need to resolve plan deficiencies with you.
Note: For those projects using the techniques and guidance from, The FAA and Industry Guide to Product Certification, the expected level of detail in a PSCP allows our project manager/engineer to identify your deliverables and hold the appropriate parties responsible for fulfilling their commitments. It similarly binds us to the commitments we made.
2-17. Phase IV. Implementation. This phase includes:
• Data Submittal for Approval.
• FAA design evaluation.
• Conformity inspections.
• Applicant test plan and FAA approval.
• (Before witnessing) engineering and flight tests.
• Engineering certification tests.
• Engineering compliance inspection.
• Analysis.
• Experimental airworthiness certificate.
• Ground inspections, ground tests, and flight tests.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source