AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
• Interim TCB meeting for [project specific] certification plan agreement.
2-13. FAA Involvement. For planning purposes, the FAA and applicant certification teams will determine which aspects of the project the FAA will maintain involvement and the extent of FAA involvement. Due to resource constraints, FAA involvement in certification activities may be limited. FAA certification team members will review your design descriptions and project plans, determine where their attention will yield the most benefit, and coordinate their intentions with you.
a. When a particular decision or event is critical to product safety or compliance determination, we stay directly involved (as opposed to indirect involvement by, for example, DERs). Some key issues that will always require our direct involvement include rulemaking (such as for special conditions), equivalent level of safety (ELOS) determinations, developing issue papers, and compliance findings that we consider unusual or typically reserve for ourselves. While these items set the minimum direct FAA involvement, we may also identify additional critical safety findings, based on the safety impact, complexity of the requirement, or the method of compliance. We will determine our level of involvement based on your experience, your internal processes, and the experience of your designees.
b. When we focus FAA resources to oversee the most critical areas, we make the best use of the ACO’s limited resources.
c. Once the project team has determined the findings requiring our involvement, we consider all other compliance requirements acceptable for delegation. Once we delegate a finding, we’ll determine any increase in direct involvement based on its level of criticality.
d. You can write an agreement with your ACO describing the process where you, under the supervision of the management DER, can do the project with maximum independence from us, except for establishing the certification basis, accepting ICA, noise and emissions findings, signing the STC, and approving and signing the flight manual supplement. See chapter 4 for more information on using designees.
e. We use conformity inspections for both quality assurance and engineering purposes. As part of the type certification process, the ACO should identify the affected areas of the product to be conformed for certification. During the inspection, FAA manufacturing inspectors base the extent of their assessment on factors such as quality of your conformity paperwork, comparison of inspection results, and size and complexity of the inspection.
f. You are responsible for identifying the test articles used to generate compliance data, and for conducting 100 percent applicant conformity of those test articles as required by 14 CFR § 21.33(b). The ACO identifies features, attributes, and components critical to the test results and requests FAA conformity on these test articles with special instructions as necessary. FAA conformity is a validation of your conformity. The manufacturing inspection district office (MIDO) determines what conformity inspections will be necessary for processing production approvals.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source