FAA Advisory circularActive

AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 35 · PDF page 35

Figure 2-2. TC, ATC and STC Process

Start

A

YES

ACO

Applicant Provides Conformity Test Plan

Are Engineering Tests, Compliance Inspections, or Conformity Inspections needed?

Applicant provides familiarization briefing

Conducts pre- project guidance as required by Order 8110.4

NO Applicant Submits Test Data and/or Inspection Data

ACO

Applicant Applies for STC and submits application package per Order 8110.4

CPN Form and also letter to applicant acknowledging the project.

ACO

FAA

Establishes the Certification Team, prepares the CPN Form, issues the Project Number, and begins project planning. NOTE: For STC project types listed in Appendix 1, Figure 6 of Order 8110.4, ACO to ACO coordination is required.

Reviews the applicant’s data.

FAA / Applicant

Conducts Conformities, Reviews Test Plans, and Witnesses Tests per Order 8110.4

Meeting minutes and Action Items

Applicant presents Familiarization material on the project and submits a proposed Certification Basis.

Conduct a Preliminary TC Board meeting per Order 8110.4

Is Flight Testing Needed?

Applicant Submits Drawings, Analysis, and Computations per Order 8110.4

ACO

YES

Release Issue Paper as required

Establishes Cert. Basis per Orders 8110.4 and 8110.48.

Operating Limitations and Information for Type Certificate Data Sheet

NO

FAA / Applicant

B

Achieve Certification Plan Agreement or PSCP per Order 8110.4

Type Certificate/ Type Design Data per 14 CFR § 21.31 and 14 CFR § 21.41

FAA

A

Compliance Reports (Substantiating Data)

Finds that the applicant has shown that the type design, test reports, and computations necessary to show that the product meets applicable regulations and that no feature or characteristic makes it unsafe for the category in which certification is requested per 14 CFR § 21.21.

Submittal of Instructions for Continued Airworthiness per Order 8110.54

C

View figures, tables and original page layoutOriginal source page Source page 35 · PDF page 35 of AC 21-40A

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.