Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 58 · PDF page 58

installation in appendix 2. These illustrate the type of information required on drawings of various types and an acceptable way of organizing a drawing system.

5-10. Guidelines for Checking Drawings. Before you submit drawings to us, have them reviewed using a guide or other system, by someone other than the person responsible for drafting them. For descriptive data, the first such check may be performed by the engineer. The following is an example of a drawing checklist:

Note: Company standards are allowed as long as they meet the intent of this guidance material.

a. Make sure the design is both accurately and completely portrayed. Then, review the contents of the drawing.

b. Each part should be correctly drawn and illustrated, with all necessary views of the part shown on the drawing.

c. Dimensions:

(1) Check the accuracy of all dimensions by scaling and, where advisable, also by calculation.

Note: Preserve all calculations.

(2) Check the completeness of the dimensions to verify that no adding or subtracting is required for a needed dimension.

d. Tolerances should not be too “fine” or too “coarse,” which might impact the duplication accuracy or operation.

Note: Each production part should be within established tolerances.

e. Check finishes for proper specification on each part and assembly drawing.

f. Check material specifications to verify that every specification is correct and that all necessary information is given.

g. Part compatibility:

(1) Check for interference, or compatibility of each adjacent part, in the final assembly to ensure proper clearances. Use “worst case” tolerance limits.

(2) Lay out the mechanical movement clearances to scale and check them for interference (considering tolerances) in all positions at the extreme limits of travel.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.