AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
h. Check detail parts to verify that all screws, bolts, pins, rivets, and so forth are standard product quality parts and that, where applicable, you have used stock sizes.
i. Present the following information in the Title block:
(1) Drawing number to identify the print for filing purposes and to prevent confusion with other prints.
(2) Name of the part or assembly.
(3) Scale to which it is drawn.
(4) Date.
(5) Name and address of the applicant and firm.
(6) Name of the draftsman, checker, and the person who approved the drawing.
(7) Product model, detail or assembly it is to be used on.
(8) Drawing number of the next higher assembly.
j. In the Bill of Material block, present:
(1) Number of the part or assembly.
(2) Name of the part or assembly.
(3) Material from which the part is to be constructed.
(4) Quantity required.
(5) Source of the part or material.
k. In the Revision block, list:
(1) Identification symbol.
(2) Numbered or lettered changes (A through Z is followed by AA through ZZ. Do not use I, O, Q, and X.
(3) Date.
(4) Nature of the revision.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source