AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
(4) Implementing the plan for continued airworthiness.
k. Discuss a post-STC plan with us. It’s particularly important that you have a plan for evaluating service data, notifying us of safety critical service problems, and expediting development of corrective actions for unsafe conditions. Another important element of the plan is the process by which you modify the changed product and we amend the STC.
l. Major changes to the original STC must be FAA-approved before you operate the changed product. Minor changes may be accomplished in a manner found acceptable to the FAA. Submit both types of changes to the original STC design and any substantiating data for approval and inclusion in FAA data files.
1-8. Operation and Maintenance of a Product Modified by an STC.
a. In addition to approving the data for the STC, we also review how the alteration will affect aircraft operation and maintenance after the STC is complete. As required, include an aircraft flight manual supplement (AFMS), placards, instructions for continued airworthiness (ICA), installation and removal instructions, and other necessary information in the STC installation package. You must give the owner or operator the information needed to keep the aircraft safe and airworthy.
b. Develop ICA and present it in conjunction with the STC process. The ICA contains an airworthiness and maintenance portion. We do approve the airworthiness limitation section of the ICA. On the other hand we don’t approve the maintenance portion of the ICA, but we accept it, per the requirements in 14 CFR §§ 23.1529, 25.1529, 27.1529, 29.1529, 31.82, 33.4, and 35.4. ICA instructs how to maintain products that are altered, and appliances that are installed, in accordance with an STC. If there is a need for you to obtain a design approval without a complete ICA, we will do so if we approve a plan submitted by you that ensures all ICA requirements will be complete and accepted before the first affected aircraft is operated with a standard airworthiness certificate. This means an aircraft can be modified, but cannot return to service until we accept the complete ICA. In this case we must include a statement saying, “Instructions for Continued Airworthiness are Incomplete”. The aircraft will be eligible to return to service with a standard certificate of airworthiness when the ICA are complete and accepted in the Limitations section of the STC. FAA Order 8110.54, Instructions for Continued Airworthiness Responsibilities, Requirements, and Contents, tells ACOs how to help applicants write ICA.
c. ICA must include all necessary functions to keep the aircraft airworthy. Include information such as troubleshooting, servicing, inspections, and functional checks.
d. An aircraft alteration that changes the operating characteristics or procedures for safe operation should include an aircraft flight manual supplement (AFMS). See chapter 2 of this AC for more details about AFMS.
1-9 . Undue Burden on the FAA. Title 14 CFR §§ 21.43, 21.137, 21.303(g), and 21.601(c), state that the Administrator does not issue type certificates and production
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source