AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
09/27/07 AC 21-40A Appendix 4
FAA Form 8120-10 (11-05) Supersedes Previous Edition (Representation)
1. Request for Conformity Inspection: Enter the FAA office that the applicant asks to perform the conformity inspection.
2. Project No.: Enter the FAA project number for the project.
3. Date: Enter the current date.
4. Part Conformity/Installation/Other: Check the applicable blocks.
5. Applicant Name: Enter the name of the applicant as shown on the original project application.
6. Company Name: Enter the name of the supplier, vendor, or test firm where the desired inspection will occur.
7. Street/City/State/Zip: Enter the address of the company named above. A post office box is not acceptable.
8. Time/Date Available: If you know when the product, part, assembly, appliance, or test article will be ready, enter the expected date.
9. Type Installation: Enter a brief descriptive statement, which includes the product, part, assembly, appliance, or test article to be inspected (for example, landing gear assembly, galley flammability test articles, wing spars, and so forth).
10. Make/Model: Identify the end product being certificated or modified.
11. Quantity: Enter the quantity of parts requiring inspection (for example, 1 shipset, 5 test samples, and so forth).
12. Requesting document such as a purchase order ( P.O.) and date: Reference the applicant’s letter or other correspondence identifying the pending certification test.
13. Design Data: Identify the data to be used for the inspection, that is, drawings (including revision and date).
14. Special Instructions: Enter any special instructions, as necessary.
15. Applicant Contact: Enter the name, title (if known), and telephone number of the person to contact at either the applicant’s or the vendor organization to arrange the inspection.
16. FAA Project Manager: Enter the name and telephone number of the FAA project manager.
17. FAA Project Engineer: Enter the name and telephone number of the FAA project specialist involved in the pending test. In “Remarks,” (if applicable), enter:
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source