AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
you to appropriate regulatory, policy, and guidance material, and then perhaps get involved directly. We might do this to determine how unique or novel your proposed design is, or to research past policy applications.
2-5. Familiarization Briefing. Familiarization briefings give potential applicants the opportunity to describe their project to the ACO before application. The main purpose is to familiarize us with your proposed design as you currently know it. Learning about projects before submission of the application also allows the ACO to consider FAA involvement and begin planning resources. In your briefing to us, emphasize any technical issues and unique or novel features. Beyond the design features, tell us about the intended operation, major suppliers and unusual vendor relationships, reliance on approved equipment, project schedule, reliance on designees or delegated organizations, and any other planned alterations on the prototype product.
2-6. Certification Plan Requirement. We will ask you to submit a certification plan for the STC project. The certification plan is a “road map” that both of us will agree on and follow. In general, the certification plan should contain detailed descriptions of the type design change, methods of compliance, how much and type of testing is necessary, when and where you will use designees, and schedule information. The certification plan should be considered a “living document,” and be revised as necessary when project circumstances change. When revised, the certification plan will need the concurrence of the project manager. Figure 2-4 shows a sample certification plan outline. See further discussion on certification plan contents in paragraph 2-8.
2-7. Phase II. Requirements Definition. This phase includes:
• Applying for STC and submitting the certification plan.
• FAA establishing a project.
• When applicable, submit a project specific certification plan (PSCP).
• Establishing the certification basis.
2-8. Applying for STC and Submitting the Certification Plan.
a. The formal STC certification process begins when you submit the application form, FAA Form 8110-12, Application for Type Certificate, Production Certificate or Supplemental Type Certificate. You submit the application to the FAA ACO responsible for your geographic location. See appendix 1 of this AC for instructions to complete Form 8110-12, and a sample of a completed form.
b. Transmit the application to the ACO with a cover letter and the certification plan,
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source