FAA Advisory circularActive

AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 16 · PDF page 16

including:

(1) Project description.

(2) Type of product.

(3) Schedule for project completion.

(4) Locations where design, parts manufacturing, and installation work as well as ground and flight tests will be conducted.

(5) Request to schedule a project initiation meeting (at your discretion).

(6) Foreign aviation authority’s agreement if you intend to use foreign-registered aircraft for the STC project.

Note: If the foreign aviation authority plans to validate our STC, then application for that authority’s certification should be made as soon as possible.

(7) Your phone number and e-mail address.

c. We should have evidence of authorization if you intend to authorize one or more agents to represent you during the STC certification program. A letter of authorization is acceptable. Attach it to the letter that transmits the application.

d. We require each applicant to submit a copy of the program’s certification plan with the application package. We expect that you have developed a reasonably detailed program plan before submitting an application for STC. The certification plan should be comprehensive and sufficiently detailed to allow a good understanding of how you plan to accomplish the requirements for certification. One of the first milestones in the STC process is our acceptance of your certification plan. We use the standards in current FAA directives to review your plan. Your certification plan should include the following elements:

(1) General Information. (Corresponds to sections I through VII in Figure 2-4.) Applicant identification, along with the application date, and model designation of the unchanged product. Briefly but completely describe the modification. Present the certification basis, including any applicable exemptions, equivalent level of safety findings, and special conditions. Describe your methods of compliance, including tests, component, ground, and flight, analysis, and similarity. Include a list of data that you’ll submit to show compliance. See chapter 3 for more information about identifying the applicable regulations.

(2) Certification Project Schedule. (Corresponds to section VIII in Figure 2-4.) Identify dates of major milestones, dates for submittal of data and test plans, dates and locations for parts conformity inspections and installation conformity inspections, dates and locations for testing, and the planned project completion date.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.