FAA Advisory circularActive

AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 28 · PDF page 28

a. After you submit your Statement of Conformity, FAA Form 8130-9, we issue the TIA and arrange with FAA manufacturing inspection for the conformity inspections called for in TIA. The ground inspection physically verifies that the aircraft submitted for flight test meets the minimum requirements for quality, conforms with the technical data, and is safe for the intended ground and flight tests. Record the results together with any other data requested by FAA engineering and flight test personnel.

b. Our FAA manufacturing inspector initially accepts the test aircraft for FAA flight testing. Initial acceptance is based on their determination of the aircraft condition for safe operation and the testing to be conducted. The manufacturing inspector and the flight test pilot should establish a mutually agreeable way to inform the project manager of daily changes to the aircraft and problems encountered during flight test. Remember that the test aircraft must be placed in the experimental category and receive an experimental airworthiness certificate for the purpose of showing compliance.

c. We use certification flight tests to verify the flight test data you reported. These tests evaluate the aircraft’s performance, flight characteristics, operational qualities, human factors, and equipment operation. They also determine operational limitations, procedures, and pilot information. Certification flight tests are conducted under the TIA and may include flight, ground, and functional and reliability testing. See AC 23-8, Flight Test Guide for Certification of Part 23 Airplanes; AC 25-7, Flight Test Guide for Certification of Transport Category Airplanes; AC 25.1581-1, Airplane Flight Manual; AC 27-1, Certification of Normal Category Rotorcraft; and AC 29-2, Certification of Transport Category Rotorcraft. These advisory circulars are available at http://www.airweb.faa.gov/AC.

d. Arrange with the FAA project team for ground and flight testing called for in the TIA. The FAA project flight test team or an authorized DER will conduct official ground and flight testing.

2-31. Aircraft Evaluation Group (AEG) Activities.

a. Operational and Maintenance Evaluations (AEG Responsibilities). We established AEGs to meet our operations and maintenance responsibilities during a type certification project. AEGs are comprised of operations and airworthiness inspectors who work directly with aircraft certification personnel to lend operational perspective to engineering activities. AEGs advise manufacturers of applicable operational and maintenance requirements during design and certification. They also make recommendations to flight standards about flight training, inspection programs, and flight crew qualifications. AEGs participate in the maintenance review board (MRB), flight standardization board (FSB), and the flight operations evaluation board (FOEB). They are also the Flight Standards focal point for the master minimum equipment list (MMEL), ICA, and post-certification activities, such as ADs.

b. Instructions for Continued Airworthiness (ICA). ICA are required in accordance with 14 CFR § 21.50 and prepared following 14 CFR §§ 23.1529, 25.1529, 27.1529, 29.1529, 31.82, 33.4, or 35.4.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.