AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 27 · PDF page 27

b. We will evaluate your flight test report for compliance with the requirements of the certification basis. After our acceptance of your flight test reports, if verification of certain flight tests is required, official FAA certification testing, as called for in the TIA, may start.

2-29. Type Inspection Authorization (TIA).

a. When examination of technical data required for the STC is complete, or where it appears the aircraft will meet the certification basis and the modification or installation is complete, we will prepare and issue a TIA, FAA Form 8110-1. The TIA is an internal FAA document prepared by our engineering staff. We issue it to FAA manufacturing inspection and FAA flight test personnel. The TIA authorizes FAA manufacturing inspection to conduct conformity and airworthiness inspections, and authorizes FAA flight test to conduct flight inspections. Plus if there are operational and airworthiness requirements to be addressed, we include AEG operational evaluations. When we issue the TIA we send a courtesy copy to you, to help you plan for the inspections and tests. You must complete all inspections and tests called for by the TIA satisfactorily before we issue the STC.

b. Before we issue the TIA, a flight test risk management assessment must be performed by FAA flight test personnel. The signed TIA reflects our adherence to ACO/directorate flight test risk management processes in accordance with FAA orders to ensure that the associated flight test risks are acceptable. Our risk management process accomplishes risk assessment through a safety review process. Project and non-project personnel review a flight test plan to expose potential hazards, and recommend procedures to lessen them. In the process, we:

(1) Identify hazards,

(2) Assess the risks involved,

(3) Set up mitigating procedures to reduce or eliminate the risks, and

(4) Decide, at the appropriate level, whether to accept residual risks.

c. We include acceptance of risk management and the level of risk for each TIA test. For detailed information about our risk management process, contact the FAA flight test team.

d. We, or our authorized designee as identified in the certification plan, accomplish all necessary conformity inspections and airworthiness determinations per the TIA. TIA testing can start after we satisfactorily complete the inspections and determine that the aircraft is airworthy. We record conformity inspections on the Conformity Inspection Record, FAA Form 8100-1.

2-30. Flight Test Conformity Inspections and Certification Flight Tests.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.