FAA Advisory circularActive

AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 38 · PDF page 38

Figure 2-3. STC Project Initiation Checklist, continued

l. Will designees be used on the program? If so, identify the number of designees, name and type of delegation for each, and explain how each designee will be used on the project.

m. What types of tests are anticipated? What constitutes test plans, conformities for setups and witnessing of tests, applicant versus FAA tests, and (if applicable) placing the aircraft in experimental category.

n. Will special instructions be necessary to tell the pilot how the modified aircraft will now operate? If so, prepare a flight manual supplement.

o. It is the applicant’s responsibility to establish a certification test plan and compliance checklist, and to determine the modification meets all applicable airworthiness standards.

p. Was a Failure Hazard Analysis (FHA) or a Systems Safety Analysis (SSA) submitted to us so we can evaluate the risk assessment of the modification with respect to the product and make an assessment of our level of involvement?

q. What data should be submitted before issuance of TIA and STIR, and how are they used?

r. What guidance is available? (i.e., guides, ACs, Orders, Notices, and handouts.)

s. What can be done to the product while in modification/conformity process?

t. What is the potential for the modification impacting 14 CFR part 34 ( Fuel Venting and Exhaust Emission Requirements for Turbine Engine Powered Airplanes) and 14 CFR part 36 (Noise Standards: Aircraft Type and Airworthiness Certification) requirements?

u. Is a document list submitted, with revision levels and approval dates, of safety analysis, test plans, test reports and software documents?

v. Is the product being modified the subject of an airworthiness directive or service problem?

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.