FAA Advisory circularActive

AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 14 · PDF page 14

CHAPTER 2. THE STC PROCESS

2-1. General. While this chapter describes the STC certification process for an aircraft, the process is similar for an engine or propeller. Only major changes in type design require approval through issuance of an STC by the ACO. The STC process is divided into five phases:

• Phase I - Conceptual Design (paragraph 2- 2)

• Phase II - Requirements Definition (paragraph 2- 7)

• Phase III - Compliance Planning (paragraph 2- 12)

• Phase IV - Implementation (paragraph 2- 17)

• Phase V - Post Certification Activities (paragraph 2- 34)

2-2. Phase I, Conceptual Design. This phase includes:

• Process orientation.

• Pre-project guidance.

• Familiarization briefing.

• Certification plan requirement.

2-3. Process Orientation. We encourage applicants seeking an STC approval to contact the ACO in their geographic area (see website for ACO locations http://www.faa.gov/aircraft/air_cert/locate_office/aco/) before submitting an STC application. During this initial contact, an ACO project manager will discuss the type of approval you’re requesting, and assess your knowledge of certification procedures. The project manager will conduct a process orientation for applicants unfamiliar with certification. The process orientation establishes our partnership with you and helps you understand the type certification process as it applies to your design. The orientation will explain the need for certification, the certification process, our role, your responsibilities, and the advantages of maximizing the use of designees.

2-4. Pre-Project Guidance. We require an STC application with a certification plan before providing full access to FAA resources necessary to complete a project. However, before this application, we respond to your questions as a potential applicant about FAA procedural and technical requirements that may arise after your process orientation. The ACO will first direct

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.