AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
Figure 2-1. STC Process
Phase I. CONCEPTUAL DESIGN (Paragraph 2-2)
a. Process orientation. b. Pre-project guidance. c. Familiarization briefing. d. Certification plan requirement.
Phase II. REQUIREMENTS DEFINITION (Paragraph 2-7)
a. Applying for STC and submitting of the certification plan. b. FAA establishing a project. c. When applicable, submit a project specific certification plan (PSCP). d. Establishing the certification basis.
Phase III. COMPLIANCE PLANNING (Paragraph 2-12)
a. FAA involvement. b. Using parts produced by technical standard order (TSO) authorization or parts manufacturer approval (PMA) in certification testing. c. Completed (project specific) certification plan. d. Interim Type Certification Board (TCB) meeting for (project specific) certification plan agreement.
Phase IV. IMPLEMENTATION (Paragraph 2-17)
a. Data submittal for approval. b. FAA design evaluation. c. Conformity inspections. d. Applicant test plan and FAA approval. e. (Before witnessing) engineering and flight tests. f. Engineering certification tests. g. Engineering compliance inspection. h. Analysis. i. Experimental airworthiness certificate. j. Ground inspections, ground tests, and flight tests. k. Review of applicant’s flight test results. l. Type inspection authorization (TIA). m. Flight test conformity inspections and certification flight tests. n. Aircraft evaluation group (AEG) activities. o. Aircraft flight manual supplement.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source