AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
AC 21.101-1, Establishing the Certification Basis of Changed Aeronautical Products, covers how to establish a certification basis for changed products in detail. You’ll find the most current version of this AC on the internet at http://rgl.faa.gov.
d. You are responsible for showing that the changed product complies with the applicable regulations. You do this by submitting substantiating data, such as computations and analyses, and results of tests, including flight tests, that demonstrate the modified aircraft, aircraft engine, or propeller complies with the applicable regulations.
e. Your data submittals must contain enough detail and substantiating data to completely describe the design of the modification or installation, and to demonstrate that the design complies with the applicable airworthiness standards.
f. You must conduct all of the conformity inspections and determine whether the modification conforms to the descriptive data. The FAA manufacturing inspector verifies that your conformity is accurate and complete and that you comply with 14 CFR § 21.33(b). Our compliance inspection verifies that the modification meets the applicable airworthiness standards.
g. Testing is required to demonstrate compliance with the applicable regulations. Test results from, but not limited to, component, ground, and flight testing, may be required. Component testing demonstrates that detail parts, components, or subassemblies function as required to meet the applicable airworthiness standards. Ground and flight testing demonstrate that the completed modification or installation complies with the applicable airworthiness standards.
h. How long it takes to obtain FAA approval of a proposed change in type design varies with the complexity of your project. Plan, coordinate and schedule inspections, meetings, tests, and other events well in advance to ensure appropriate FAA personnel are available. Schedule and coordinate inspections, meetings, tests and other events during the planning phase of your project to the greatest extent possible. Present each schedule change, along with its impact on the overall project, to us as soon as possible for discussion and concurrence.
i. We encourage your use of designees authorized by us to approve data, conduct inspections, and witness tests. Chapter 4 describes the use of designees in detail.
j. Issuance of an STC is the primary goal of the STC certification process. However, it’s not the end of the process. There are post-issuance activities, such as:
(1) Changing or updating the design data,
(2) Maintaining the production approval,
(3) Maintaining the certification data, the method of approving minor changes, and
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source