AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
(5) Operations inspectors and airworthiness inspectors from the aircraft evaluation group (AEG), and
(6) A project officer and other persons at the discretion of the accountable directorate.
b. We establish a team for a specific project based on the project’s complexity and the number of technical disciplines involved. The team may include some or all of the staff listed above. Once the project team is established, we transmit the team’s composition, by name and discipline, to you.
c. The project manager is the ACO representative responsible for planning, reviewing, evaluating, and coordinating all aspects of a certification project. The project manager organizes the project team and is our official point of contact with you. The project manager will notify the ACO manager (or the ACO manager's issuing representative) to issue the STC once they are satisfied that all applicable airworthiness standards and other requirements (such as noise standards and fuel venting requirements) have been met and that you have established a satisfactory post certification activity plan. While you should send all formal correspondence to the FAA project manager, you can discuss technical issues directly with the applicable technical specialists and inspectors on the project team.
d. The project officer is the person in the accountable directorate designated to monitor the project. The project officer will provide project-specific rules and policy to the project team and is the focal point with the directorate for policy. The project officer is also responsible for standardization of similar projects across the ACOs. For a well-planned and executed project, it’s important to involve the project officer early to identify issues, rules and policy documents of critical concern to the directorate.
e. We draw engineers or technical specialists from three basic disciplines: airframe, systems and equipment, and propulsion. Airframe engineers cover the structural aspects of certification. Propulsion engineers cover engines, engine installations, fuel systems, auxiliary powerplant systems, and aircraft noise. Systems and equipment engineers normally cover electrical, avionics, and mechanical systems.
f. FAA flight test pilots and flight test engineers cover aircraft flight characteristics and performance issues. Flight test pilots are primarily responsible for aircraft flying qualities and human factor evaluations, while flight test engineers are primarily responsible for aircraft performance and aircraft flight manuals.
g. FAA manufacturing inspectors conduct conformity inspections of detail parts during fabrication, test instrumentation and test setups. They also conduct installation conformity inspections on flight test aircraft to determine aircraft airworthiness before official flight testing. For multiple STCs, our installation conformity inspection includes evaluating process controls to ensure that after we issue the STC, production of uniform and consistent installations or modifications continues.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source