AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
09/27/07 AC 21-40A Appendix 8
“One-only” STC: An STC applicable to only one serial number aircraft, engine, propeller, or appliance.
PACO: ACO working a certification project. May need to coordinate with the CMACO, if the project is a follow-up certification activity, such as an STC or PMA.
PAH: Production Approval Holder
PCSP: Project Specific Certification Plan
PHAC: Plan for Hardware Aspects of Certification
PMA: Parts Manufacturer Approval
POH: Pilot’s Operating Handbook
Project Engineer: FAA ACO engineer assigned to the STC project to evaluate the data submittals.
Project Manager: FAA ACO engineer or supervisor assigned to coordinate the approval process of an STC application.
Project Number: Number assigned by the FAA ACO to the STC application to facilitate approval process.
Project Team: FAA personnel assigned to the STC project.
Request for Conformity: Request from the FAA project engineer to the FAA manufacturing aviation safety inspector to perform a conformity inspection on a specific article.
Statement of Conformity: Official signed statement from the applicant signifying that the modification or installation conforms to the design data and to the type design. (FAA Form 8130-9.)
STC: Supplemental type certificate, issued for a major design change to a type-certificated product when the changes are not so extensive as to require a new type certificate.
STC Application: Application for a supplemental type certificate. (FAA Form 8110-12.)
Substantiating Data: (See “Compliance data.”)
STIR: Supplemental Type Inspection Report, an official document that allows the manufacturing inspector to record the results of the inspections and tests conducted on modified products presented for STCs (FAA Form 8110-26).
TC: Type Certificate
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source