FAA Advisory circularActive

AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 78 · PDF page 78

09/27/07 AC 21-40A Appendix 2

Sample Installation Drawing

REVISIONS

CHG. LET. CHANGES BY DATE

A ADDED NOTES 3 & 4 JOE 2/22/87

NOTES: 1. JIG ALIGN HINGE BRACKETS PRIOR TO MARKING AND DRILLING SPAR 2. THIS INSTALLATION APPLICABLE TO SCHTICKENRUDDER MODELS P-48, P-48A, P-48B PER STC #SA 70000 NP 3. LEFT WING INSTALLATION SHOWN RIGHT WING OPPOSITE 4. DRAWING NOT TO SCALE STA STA STA 76.5 41.5 6.5

' ~

60100 BRACKET DETAIL A (TYP 3 PLACES)

WING STA. 0.0 HINGE A TOP VIEW - LEFT WING

AN365-428

NUT

REAR SPAR 12

~

24

AN960-10

WASHER

AN4-6A

BOLT

12

CL SPAR

3

60100

BRACKET ASS’YS

~ ~ ~ ~ ~ ~

1.50

PART NO.

SIZE DISCRIPTION

SPEC.

NO REQ

MATCH DRILL SPAR WITH PN 60100

BOX 1 NOWHERE, AR

ACME AIRCRAFT CORP INSTALLATION HINGE BRACKETS FLAPS 60000 A

~

FIN: TOL. XX+/- .03, XXX+/- .010 X = +/- 1 OR NOTED

.257 +/- .005 DIA 4 PLACES EACH BRACKET AN4-6A BOLT, 12 REQ’D AN960-10 WASHER, 24 REQ’D AN365-428NUT,12 REQ’D.

DRW. M.S 1/20/87 CHK. SM 1/21/87 APP’D J.K. 1/22/87

Sample Assembly/Subassembly Drawing

REVISIONS

BY DATE CHG. LET.

NOTES: 1. MASK OUT BEARING PRIOR TO FINISH OPERATION 2. SCALE ~ FULL SIZE

CHANGES

#30 HOLE WAS #11

A 1/25/87 M.S.

A

PRESS FIT N4B BEARING, STAKE 4 PLACES EQUALLY SPACED, BOTH SIDES

.25 (TYP)

MATCH DRILL #30, 7 PLACES, AN470AD4-5 RIVET 7 REQ’D.

.50 (TYP)

.50 (TYP)

BEARING-HEIM

1

N4-B

COMMERCIAL

A

60101 BRACKET (2 REQ.)

RIVET

AN4-70

7

AD4-5

SECTION A-A

BRACKET

2

60101

SIZE DESCRIPTION

SPEC.

PART NO.

NO REQ

ACME AIRCRAFT CORP

BOX 1 NOWHERE, AR

ASSEMBLY HINGE BRACKET FLAP 60100 A

FIN: VINYL WASH TOL.. XX+/- .03, XXX+/- .010 X = +/- 1 OR NOTED

DRW. M.S 1/11/87 CHK. SM 1/21/87 APP SAM 1/17/87

View figures, tables and original page layoutOriginal source page Source page 78 · PDF page 78 of AC 21-40A

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.