AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
"production parts" (parts that were, or will be, produced) until you gain FAA approval of the STC and production approval. Do not ship production parts produced before PMA approval. Design changes may require additional certification testing or modifications to the parts. The MIDO will only do conformity inspections on parts required for ground or flight tests required to obtain STC approval. They will not inspect production parts. See AC 21-32, Control of Products and Parts Shipped Prior to Type Certificate Issuance. The order that governs the issuance of PMA is Order 8110.42, Parts Manufacturer Approval Procedures.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source