AC 21-40A
Guide for Obtaining a Supplemental Type Certificate
21-40A Source checked 2026-11-28
Scope, source and reading notes
Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.
Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d
(7) Process specifications.
(8) Ratings and power requirements of electrical equipment.
(9) Weight and balance data of assemblies and equipment items to be installed, and/or the complete modification, including:
• A complete list of parts added and/or removed.
• Updated aircraft equipment list.
(10) Installed placards.
(11) Instrument markings.
(12) Qualification test procedures.
e. Define the design of equipment or components to be installed, purchased and/or furnished. If the item is TSO approved, the nameplate data may be adequate. Other equipment may require a source-control drawing identifying the equipment by manufacturer, part number, drawing number, revision level, or any other necessary data. Installation instructions for the modification should include all applicable information provided by the equipment’s manufacturer.
Note: When a “multiple” STC kit is produced, it should contain an inventory of ALL parts and installation instructions. Details of the parts manufacturing data that is proprietary need not be included in the kit.
f. Include process specifications necessary for production of parts in the descriptive data package. Include all materials, fabrication, and assembly procedures.
(1) Industry standards and specifications include various SAE International Aerospace Standards, AN, MS, and NAS specifications, and various military handbooks. Supply a copy of each standard and specification as part of the descriptive data package. You may use certain other industry standard specifications or develop non-standard specifications.
(2) Non-standard specifications should include a complete and unambiguous definition of the materials to be used, detailed procedures, critical processes, temperatures, times, inspection criteria, rework limits, and so forth. We will review any nonstandard specification.
g. Identify installation instructions with a document number and an original issue date or revision level and date. They should be complete enough to allow the installer to duplicate the
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source