FAA Advisory circularActive

AC 21-40A

Guide for Obtaining a Supplemental Type Certificate

21-40A Source checked 2026-11-28

Scope, source and reading notes

Certification guidance for applicants seeking a supplemental type certificate; applicable regulations and FAA directives take precedence.

Aerospace Consulting reference note: A practical guide to the supplemental type certification process, planning, compliance data, testing, and continued-airworthiness considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b003e6dd04d9c240fc7d352800b1d33ce9625136376138618d66652dd570673d

Source page 4 · PDF page 4

5-10. Guidelines For Checking Drawings. .................................................................53

CHAPTER 6. INSPECTIONS.......................................................................................57

6-1. General. .............................................................................................................57 6-2. Conformity Inspections.....................................................................................57 6-3. Compliance Inspections. ...................................................................................57 6-4. Parts Manufacturer Approval (PMA) and Production Inspections...................57

CHAPTER 7. TYPE INSPECTION AUTHORIZATION..........................................59

7-1. General. .............................................................................................................59 7-2. FAA Form 8110-1, Type Inspection Authorization..........................................59 7-3. TIA Description. ...............................................................................................59 7-4. TIA Section 18, Part I. ......................................................................................59 7-5. TIA Section 18, Part II. .....................................................................................59 7-6. TIA Section 18, Part III.....................................................................................59 7-7. Supplemental Type Inspection Report (STIR)..................................................59

CHAPTER 8. TESTS......................................................................................................61

8-1. General. .............................................................................................................61 8-2. Component Tests...............................................................................................61 8-3. Ground Tests. ....................................................................................................61 8-4. Flight Tests........................................................................................................61 8-5. Simulator Tests..................................................................................................63

CHAPTER 9. ADMINISTRATIVE ACTIONS...........................................................64

9-1. Cancellation of a Project. ..................................................................................64 9-2. Issuance of an STC............................................................................................64 9-3. Re-Issuance of an STC......................................................................................65 9-4. Transferring Ownership of an STC...................................................................64 9-5. Use of an Available STC...................................................................................64 9-6. Amendments to an STC. ...................................................................................65 9-7. Duration of an STC. ..........................................................................................65 9-8. Loss of an STC..................................................................................................65

CHAPTER 10. SPECIAL CONSIDERATIONS FOR U.S. STCs USING FOREIGN­ REGISTERED TEST AIRCRAFT ................................................................................66

10 - 1. General...........................................................................................................66 10 - 2. Special Considerations for an Applicant Using a Foreign- Registered Test Aircraft.................................................................................66 10 - 3. Special Considerations for the FAA Aircraft Certification Office (ACO)....67

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.