FAA FAA orderActive

FAA Order 8110.4C

Type Certification

8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28

Scope, source and reading notes

FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 73 · PDF page 73

(1) Hazards are identified,

(2) An assessment is made of the risks involved,

(3) Mitigating procedures are established to reduce or eliminate the risks, and

(4) A conscious decision is made at the appropriate level to accept residual risks.

q. The Pre-Flight TCB Meeting. The pre-flight TCB meeting is held to discuss and clarify any questions the applicant may have about required FAA flight testing of aircraft. For engine and propeller certification projects, the pre-flight TCB meeting is referred to as the pre- type inspection authorization (pre-TIA) meeting. These meetings also identify any outstanding conformity inspection issues and engineering compliance determinations. Normally the TCB chairman, or the individual’s representative, issues the TIA after all issues are resolved. Either the TCB or the applicant may request this meeting. Include a CM section representative for the coordination of conformity inspections required for compliance flight testing.

r. Type Inspection Authorization (TIA). The TIA is issued after the FAA reviews the applicant’s test results package and determines its acceptability. The certification branch prepares the TIA on FAA Form 8110-1 (refer to https://employees.faa.gov/tools_resources/forms). It also authorizes official conformity, airworthiness inspections, and ground and flight tests necessary to fulfill TC certification requirements. In addition, if there are operational and airworthiness requirements to be addressed, include AED operational evaluations in the TIA. If it has been found that 14 CFR part 33 and/or part 35 certification requirements are not completed at the time of issuing TIA, the PCB must coordinate with the certification branch(s) responsible for the engine and/or propeller for concurrence or comments.

(1) Preparing and Issuing the TIA. The TIA is not prepared until coordination is accomplished with each appropriate engineering discipline and, when appropriate, the AED, so that all required information for each disciplines’ portion of the inspection or authorization is included. The TIA is issued when examination of technical data required for type certification is completed or has reached a point where it appears the aircraft or component being examined is expected to meet the applicable regulations. The TIA may be phased or issued in increments to ensure basic airworthiness and that flight test safety has been established before proceeding to the next phase.

NOTE: To assist the manufacturing inspector, the following information should be included in block 12, part 1, of FAA Form 8110-1.

Point of contact at conformity site:

Phone number of point of contact:

Location of aircraft/conformity site:

DAR requested by the applicant: (as applicable)_

(2) Coordination. Coordinate the TIA with the PCB, the project CM section, and when requested, AIR-600. Also, coordinate with the AED when appropriate.

(3) Notification. Notify and provide the applicant with a copy of the TIA after it is issued.

Par 2-6 Page 51

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.