FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
unsatisfactory and satisfactory findings. Existing designee supervision requirements remain in effect.
d. Notification Procedures.
(1) The DERs can create and send FAA Form 8120-10 to the DER coordinator, if the certification branch or CM section defines this authority in the conformity plan. This is the most direct flow for a conformity request. The DER coordinator then sends the form to the designated inspection representative and a copy to the certification branch. The DER coordinator notifies the designated inspection representatives as soon as possible, so they have time to plan for the inspection. The DER coordinator should try to make the conformity schedule available to all participating designated inspection representatives.
(2) Throughout the TC project, the FAA requires the applicant to perform conformity inspections. The certification branch project manager determines whether the FAA Form 8120-10 requires certification branch review before performing the FAA conformity inspection (hereafter called a “certification branch pre inspection review”).
(3) If a DER has permission to generate a specific FAA Form 8120-10 without the certification branch project manager’s pre-inspection review, the DER completes the form and sends it to the DER coordinator. The DER coordinator sends an information copy to the certification branch and notifies any other involved certification branch of the request.
(4) If a DER has permission to use a specific FAA Form 8120-10 with the certification branch project manager’s pre-inspection review, the DER completes a draft form and sends it to the DER coordinator. The DER coordinator sends the draft FAA Form 8120-10 to the certification branch for review before the designated inspection representative performs the inspection. During the initial planning phase, the CM section may request copies of all FAA Form 8120-10s the DER produced. If the certification branch project manager agrees, the DER coordinator also will issue a tracking number for the FAA Form 8120-10s.
(5) Before sending out a FAA Form 8120-10, the DER coordinator or certification branch reviewer must determine if the CM section has authorized direct submittal of the form to a designated inspection representative. If so, the DER coordinator or certification branch (depending on who did the final form review) sends it to the designated inspection representative to perform the conformity inspection. If not, the DER coordinator or certification branch (depending on who did the final form review) sends it to the project CM section’s manufacturing specialist or PI within 2 business days of approval. Then the manufacturing specialist or PI sends FAA Form 8120-10 to the appropriate designated inspection representative within 4 business days.
(6) If the conformity inspection is outside the project CM section’s geographic area, the DER coordinator or certification branch (depending on who did the final form review) sends the FAA Form 8120-10 to the project CM section as described in paragraph 5-5e below.
(7) There are times during a TC program when the CM section determines the CM section inspector, rather than an agreed-to designated inspection representative, should perform a particular conformity inspection. When this happens, the CM section will tell the applicant the reason, such as designee supervision or special process review.
Par 5-5 Page 111
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source