FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 41 · PDF page 41

d. Events Marking Each Phase. The events depicted in figure 2-1 are listed in figure 2-2 below and grouped by phase. Their paragraph numbers are on the right of each column.

FIGURE 2-2. EVENTS IN A TYPICAL TYPE CERTIFICATION PROCESS

CONCEPTUAL DESIGN Process Orientation ...................................................2-3a Pre-Project Guidance ................................................2-3b Familiarization Briefing ...........................................2-3c Certification Plan ......................................................2-3d

REQUIREMENTS DEFINITION Application for TC, Amended TC, and PC ............. 2-4a Establishment of TC Project .....................................2-4b Certification Project Notification (CPN) ..................2-4c Form the Certification Team (and TCB)...................2-4d Develop Certification Project Plan (CPP) ................2-4e The Preliminary TCB Meeting .................................2-4f Issue Paper ................................................................2-4g Issues Book...............................................................2-4h The Project Specific Certification Plan (PSCP) ..................................................................................2-4i Certification Basis ....................................................2-4j Interim TCB Meeting for Certification Basis ...........2-4k

COMPLIANCE PLANNING FAA Involvement .....................................................2-5a Oversight and Delegation .........................................2-5b Conformity for Engineering Purposes ......................2-5c Completed [Project Specific] Certification Plan ...........................................................................2-5d

IMPLEMENTATION Conformity Inspections ........................................ 2-6b Applicant Test Plan and FAA Approval .............. 2-6c Before Witnessing Engineering and Flight Tests .......................................................... 2-6d Engineering Certification Tests ............................ 2-6e Engineering Compliance by Inspection ............... 2-6f Analysis ............................................................... 2-6g Experimental Airworthiness Certificate ............... 2-6h Applicant’s Flight Tests ....................................... 2-6i Compliance Substantiation – General .................. 2-6j Data Submitted for Approval ............................... 2-6k Applicant Flight Test Data and Report ................ 2-6l Compliance Reports ............................................. 2-6m FAA Review of Compliance Data ....................... 2-6n Review of Applicant’s Flight Test Results .......... 2-6o Flight Test Risk Management Process ................. 2-6p Pre-Flight TCB Meeting ...................................... 2-6q Type Inspection Authorization (TIA) .................. 2-6r Flight Test Conformity Inspection ....................... 2-6s Certification Flight Tests ..................................... 2-6t Operational and Maintenance Evaluations .......... 2-6u Instructions for Continued Airworthiness (ICA) ............................................ 2-6v Function and Reliability (F&R) Flight Testing ............................................................................. 2-6w Aircraft Flight Manual ......................................... 2-6x Final TCB Meeting, Issuance of Type Certificate and Data Sheet .......................... 2-6y

Interim TCB Meeting for [Project Specific] Certification Plan Agreement ...................................2-5e

POST CERTIFICATION ACTIVITIES Certification Summary Report ............................. 2-7a Type Inspection Report (TIR) .............................. 2-7b Continued Airworthiness ..................................... 2-7c Changes to Instructions for Continued Airworthiness (ICA) ............................................ 2-7d Post-Certification Evaluations ............................. 2-7e Data Retention ..................................................... 2-7f Required Documents ............................................ 2-7g

Par 2-2 Page 19

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.