FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
a certification branch, a DER with specific authorization for major repairs and/or alterations in the necessary engineering discipline, and Organization Designation Authorization (ODA) holders.
d. Changes to Instructions for Continued Airworthiness (ICA). The rule, § 21.50(b), requires ICA changes to be made available to any person who must comply with them. The design approval holder should provide these changes according to a plan that was accepted by both the certification branch and AED. The changes should be formatted to directly supplement the original ICA and should clearly say what’s being changed.
e. Post-Certification Evaluations.
(1) Special Certification Review (SCR).
(a) An SCR is a way to evaluate the type certification project and potentially unsafe design features of previously approved products. AIR-600 may initiate an SCR after the certification project or as service experience dictates (§ 13.19).
(b) Potential safety problem areas for which an SCR may be appropriate include:
1. Complex or unique design features,
2. Advanced state-of-the-art concepts in design and manufacturing,
3. Potentially unsafe features used on similar previous designs requiring further analysis and evaluation,
4. Compliance area critical to safety and operational suitability that require evaluations,
5. Unsafe operational or maintainability characteristics,
6. ELOS determinations with potential major effects on safety, and
7. Complicated interrelationships of unusual features.
(c) Results of an SCR include a detailed review and evaluation of a product’s applicable airworthiness and operational certification requirements, recommendations for revisions, if appropriate, and improvement in achieving uniform application of certification rules throughout the FAA.
(d) The Policy and Standards Division establishes the SCR team. The team may be comprised of FAA personnel from the CMCB, the PCB, AIR-600, AED personnel, CM section personnel, or other FAA personnel, as appropriate. The team may use governmental agencies, outside consultant firms, and industry to get technical expertise to do a thorough evaluation. If an SCR is deemed necessary for an imported product, then representatives of the original certifying CAA must also be invited.
(e) Evaluation procedures used during the SCR include examination of the applicant’s or certificate holder’s data, discussions with FAA personnel and the applicant’s or certificate holder’s personnel, inspection of the prototype or production articles, and any other way for the team to perform a complete and comprehensive evaluation consistent with the purpose of the review.
(f) Thoroughly explore every significant aspect and ramification of the potential safety problem in question. Consider the adequacy of the applicable regulations and policy material.
Par 2-7 Page 59
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source