Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
(8) If the designated inspection representative determines unsatisfactory findings, they should contact the DER as soon as possible. The certification branch project manager or DER will address unsatisfactory findings as agreed to in the conformity plan. On FAA Form 8100-1, the certification branch project manager or authorized DER must disposition any non-conformities found during the conformity inspection. Periodically, the certification branch project manager and CM section must review unsatisfactory findings identified by the designated inspection representative, and how the DER addresses those findings.
(9) After the certification branch project manager or DER closes all unsatisfactory findings, they send the conformity paperwork, including FAA Form 8100-1, to the appropriate office (the designee’s CM section, certification branch, or DER coordinator) per the conformity plan. Finally, they send the paperwork to the organization responsible for tracking FAA Form 8120-10 for closure.
e. Non-Local Conformity Request.
(1) Applicants use this procedure when the conformity inspection will be outside the project CM section’s geographic area. The project CM section may authorize a designated inspection representative to perform these types of conformity inspections on a trip-by-trip basis, or for a specific time, as defined in Order 8100.8.
(2) The DER coordinator or certification branch project manager, depending on who performed the FAA Form 8120-10 final review, sends the form to the project CM section within 2 business days of final review.
(3) The project CM section coordinates with the geographic CM section where the inspection will be performed and, if authorized by the geographic CM section, sends FAA Form 8120-10 to the designated inspection representative within 4 business days. The designated inspection representative is now authorized to travel and do the conformity inspection.
NOTE: Any designated inspection representative planning to perform a conformity inspection in another geographic area must comply with the requirements in Order 8100.8 before traveling.
(4) After satisfactorily completing the conformity inspection, the designated inspection representative sends the complete conformity package, including or consisting of the FAA Form 8100-1, to the project CM section’s manufacturing specialist or PI for review. The project manufacturing specialist or PI sends the package to the appropriate office (the certification branch or DER coordinator) as defined in the conformity plan. Finally, the certification branch project manager or DER coordinator sends the package to the organization responsible for tracking the FAA Form 8120-10 for closure.
f. Conformity Discrepancies. A part that does not conform to its descriptive design data is considered a nonconforming part. This situation is known as a discrepancy. If manufacturing inspectors find discrepancies, they can request a complete re-inspection by the applicant. The certification branch project manager does not intend nor recommend that manufacturing
Page 112 Par 5-5
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source