FAA FAA orderActive

FAA Order 8110.4C

Type Certification

8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28

Scope, source and reading notes

FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 132 · PDF page 132

disposition. They should coordinate all documentation through the project CM section. The project CM section keeps the documentation in the CM section project file and records certification branch dispositions and subsequent corrective action.

b. Verbal Notification. When quick action is necessary to conclude the project, manufacturing inspectors should notify the CM section verbally that they have completed a satisfactory inspection. They should enter the date of the verbal notification on the FAA Form 8100-1.

c. Addressing Irregularities. The manufacturing inspector should receive a report stating the disposition of, or corrective action required for, each irregularity reported on an FAA Form 8100-1. If a CAA identifies an unsatisfactory condition in a conformity inspection that has been delegated, the certification branch must disposition and reply to the CAA to resolve the situation.

d. Resolving Unsatisfactory Items. The CM section should determine that the applicant has satisfactorily resolved all unsatisfactory or nonconformity items before coordinating on the final approval document.

5-9. TEST ARTICLES – GENERAL. Before inspecting the conformity of test articles, the applicant, the certification branch project manager, and the manufacturing inspectors must clearly understand the test article configuration, test equipment configuration, and expected results. Consider the type of test being conducted and the calibration expiration date of the test equipment. The applicant may need to recalibrate the test equipment to ensure the equipment is within its calibration expiration date when testing begins. The applicant should submit this information to the certification branch in test proposal reports. The PCB may issue an FAA Form 8120-10 referencing these reports. The TIA should reference the final test flight article configuration.

5-10. WITNESSING OFFICIAL TEST. Manufacturing inspectors may witness official FAA tests – such as static, endurance, operational, pressure, and environmental tests – as requested by the certification branch project manager. Test requirements may be included in the FAA Form 8110-1 or in the FAA Form 8120-10. In all cases, the certification branch project manager should give the manufacturing inspector the appropriate instructions and a reference to the applicant’s test proposal report. The manufacturing inspector should not witness any test without prior coordination with the certification branch project manager. When witnessing official tests delegated by the certification branch project manager, the manufacturing inspector should determine whether the applicant followed the instructions and test schedule described in the applicant’s test proposal report. After a test, the test witness must sign a record that shows the results were obtained by properly following the approved test plan. This record should identify the test and include the results obtained, the decisions reached, and any recommendations made to the applicant. The manufacturing inspector must add a copy of this record to the test report. They should send a copy of the applicant’s test log or report, and the completed FAA Form 8100-1 to the PCB.

5-11. STRUCTURAL TEST ARTICLES – AIRCRAFT.

a. Conformity Determination. Determining conformity of structural test articles is an essential part of type certification. While witnessing these inspections, manufacturing inspectors should detect and report any nonconformities on an FAA Form 8100-1.

Par 5-8 Page 117

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.