FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
branch and CM section should finalize a comprehensive conformity plan (also known as conformity verification plan) together. Base this conformity plan on the test article and schedule data in the applicant’s certification plan.
(2) To expedite agreement of a completed PSCP, applicants should develop their test article and schedule data into a conformity plan that the certification branch and CM section can accept with minimal further development (see paragraph 5-5 of this order). Applicants should consider the conformity requirements elsewhere in this and other orders and present a plan that supports their showing of compliance for a TC and the FAA’s finding of compliance for the TC and PC. While applicant involvement in the conformity plan is strongly encouraged (only the supporting data listed in paragraph 2-3d of this order are required), the FAA must retain the discretion to make the inspections necessary to determine compliance with the applicable 14 CFR requirements. Therefore, the FAA is responsible for the final content of the plan.
(3) Using Parts Produced by Technical Standard Order (TSO) Authorization or PMA in Certification Testing.
(a) Either of these approvals indicates that the production system has determined that the part produced conforms to a specifically defined FAA-approved design, and that any deviations from that approved design have been dispositioned and found to have no effect on form, fit, or function of the article. In accordance with § 21.601(b)(4), an article manufactured under a TSO authorization is an FAA-approved article. For parts produced under a Parts Manufacture Approval (PMA), the corresponding regulatory definition for the quality control system is § 21.307. Marking of the part in accordance with § 45.15 conveys the same indication that a part meets the FAA-approved design.
(b) Because of a part’s approval by TSO or PMA, a part conformity may not be necessary for its use in a certification project. Certification branch engineering should consider whether the testing to be accomplished requires a test article definition more specific than the “form, fit, or function” of the part provided by the TSO or PMA. For example, the engineer may be concerned about a test article having features biased to one or the other end of a tolerance. If certification branch engineering wants to ensure the part does not have a bias that may affect the outcome of the test, the engineer may ask the inspector to review any MRB action for deviations to the test article referencing the characteristic the engineer identifies. Indicate this in the “Special Instructions” section of the Request for Conformity Inspection. For this order, a deviation is a non-conformance that is found and accepted by means of certification branch engineering evaluation or MRB action.
(c) Certification branch engineering may determine that an installation inspection is adequate for its needs. The installation conformity inspection, which follows the certification branch review of the substantiating data, is performed to verify the installation was accomplished in accordance with the approved data, with all or any discrepancies noted, before official FAA testing. It is during the installation conformity inspection that the article’s TSO number, part number, serial number, software part number or version, and so forth, as referenced in the installation data, are verified, and recorded.
d. Completed [Project Specific] Certification Plan. By this point in the project, the details of the applicant’s plan for showing compliance, including the remaining elements outlined in paragraph 2-3d above should be captured in the certification plan or PSCP. From
Par 2-5 Page 39
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source