FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
this information, the certification team should be able to determine that, if the plan was successfully executed, its results would show compliance. The amount of detail necessary to avoid ambiguity will vary from finding to finding, but, in general, it decreases when the applicant chooses common means of compliance such as those described in ACs. The certification team should find the plan agreeable before processing conformity requests, approving test plans, witnessing, or observing certification tests, or performing any other certification project activities, to ensure the certification team and the applicant are working with the same fundamental understanding of the certification data.
e. Interim TCB Meeting for [Project Specific] Certification Plan Agreement. This is the formal meeting to establish consensus on all integrated certification planning. During this meeting, use the PSCP (or the certification plan and CPP) to assess the certification risks of proceeding into the actions of showing and finding compliance. Obtain mutual agreement to the adequacy of the plan and acceptance of the risks before proceeding with implementation. The certification team may hold one main Interim TCB Meeting to reach agreement on how the project will be conducted, followed by splinter meetings to address the certification activities required for the various systems, disciplines, or components of the aircraft design. When dividing the TCBM this way, the project-level agreement of the certification plan must include a realistic schedule for splinter meetings. The TCB meeting for certification plan agreement concludes with the completion of its splinter meetings. Use an Interim TCBM to establish agreement with the certification plan when the following happens:
(1) The project requires significant coordination of resources,
(2) A face-to-face meeting would better help all involved parties understand how compliance will be shown,
(3) The applicant requests one,
(4) Issues with the certification plan need management visibility,
(5) The project manager wishes to encourage teamwork within the FAA and with the applicant,
(6) Numerous comments and questions could be more efficiently addressed in person, and
(7) Ambiguities in the plan need to be resolved.
NOTE: The expected level of detail in a PSCP allows the project manager/engineer to identify the applicant’s deliverables and hold the appropriate parties responsible for fulfilling their commitments and vice versa.
Page 40 Par 2-5
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source